Revision 5 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 8, 2026 +0 −0

Tag-only update
Showing changes from Rev 4 to Rev 5 in Window Treatments.
Tag changes +Building Automation+Controls+Daylighting+Energy Efficiency+Hardware+Windows
---
title: Window Treatments
710 unchanged lines
## For motorized systems, the Contractor shall turn over spare motors, control devices, and a power supply of each type, together with the configuration tool, the zone map, and the credentials required to service and reprogram the system.
## The maintenance data shall state the approved fabric-cleaning method and the recommended inspection interval for the cord-safety devices and the motorized limits.