SynC · Editorial revision

Arc-Flash Study

Revision7
EditedOct 19, 2026
StatusCurrent
Contents

View changes in this revision   Revision history

Current revision. This is editorial revision 7, the current text of this standard. Read it on the standard's page.

Remake batch 25 and its neighbor re-points, batch 24 where missing, and the adopted-electrical-code parameter: brought in line with the authoring repository

1 Scope

NOTE This standard governs the arc-flash study as an engineering deliverable: the engineer who performs it and when it is issued, the calculation method, the buses studied, the cases, the inputs the study adds to the system model it inherits, the clearing time it takes from the coordination settings, the content of the label at each bus, the PPE arc rating it hands to the facility's safety program, the mitigation it recommends, the report, and the review cycle that keeps the labels true. (1.1)
NOTE NFPA 70E 130.5 requires an arc flash risk assessment for every task a worker performs on energized equipment, and NFPA 70 110.16 requires the equipment likely to be worked on energized to carry a label that warns of the hazard; 110.16(B) adds, for service and feeder equipment rated 1200 A and more, the incident energy or the arc rating the worker needs. OSHA 29 CFR 1910.333 and 1910.335 require the employer to protect the worker from the hazard the equipment presents. None of these can be met from a nameplate; each rests on the incident energy at the bus, and this study is that calculation. (1.2)
NOTE The arc-flash study is the last of three studies performed on one system model. The short-circuit study under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study gives the bolted fault current at every bus, the coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study fixes the settings that decide how long the arc burns, and this study turns the two into incident energy, an arc-flash boundary, and a label. A change to either predecessor moves every result here, which is why this study is not started until the coordination settings are accepted and is re-run whenever they change. (1.3)
NOTE The following are governed elsewhere and are outside this standard: (1.4)
  • the bolted fault currents, the X/R ratios, the utility's contribution, the transformer, conductor, and machine impedances, the source operating configurations, and the survey of existing equipment that feeds the model, under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study, which hands this study its model and its results
  • the protective device settings and the clearing times they produce, under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study, which this study reads and does not change
  • the arc-flash label as a physical product, its material, its lettering, its attachment, and its location on each item of equipment, under Equipment LabelingElectrical Equipment LabelsResolves to the current adopted revision.sync/equipment-labeling; this study supplies every value printed on it
  • the facility's written electrical safety program, the energized work permit, the task-level risk assessment, the shock protection boundaries as work rules, the training of qualified persons, and the procurement of PPE, under Electrical Safety ProgramElectrical Safety ProgramResolves to the current adopted revision.sync/electrical-safety-program, which consumes the incident energy, the boundaries, and the arc ratings this study reports
  • the field verification that each trip unit and relay is set to the accepted settings, under Electrical Acceptance TestingElectrical Acceptance TestingResolves to the current adopted revision.sync/electrical-acceptance-testing, whose as-left settings record this study is confirmed against
  • the arc energy reduction NFPA 70 240.67 and 240.87 require, the maintenance switch, the zone-selective interlocking, and the arc-resistant construction, as features the equipment is ordered with, under Low Voltage SwitchgearLow Voltage SwitchgearResolves to the current adopted revision.sync/low-voltage-switchgear, Low Voltage SwitchboardsLow Voltage SwitchboardsResolves to the current adopted revision.sync/low-voltage-switchboards, Medium Voltage SwitchgearMedium Voltage SwitchgearResolves to the current adopted revision.sync/medium-voltage-switchgear, and the other equipment standards; this study calculates their effect and recommends them where they pay
  • the arc-flash warning on each item of equipment and the operating state its label states, which each equipment standard requires and this study supplies the values for, under PanelboardsPanelboardsResolves to the current adopted revision.sync/panelboards, Motor Control CentersMotor Control CentersResolves to the current adopted revision.sync/motor-control-centers, BuswayBuswayResolves to the current adopted revision.sync/busway, Automatic Transfer SwitchesAutomatic Transfer SwitchesResolves to the current adopted revision.sync/automatic-transfer-switches, Generator Paralleling SwitchgearGenerator Paralleling SwitchgearResolves to the current adopted revision.sync/generator-paralleling-switchgear, Secondary Unit SubstationsSecondary Unit SubstationsResolves to the current adopted revision.sync/secondary-unit-substations, Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance, GeneratorsEngine GeneratorsResolves to the current adopted revision.sync/generators, Industrial Control PanelsIndustrial Control PanelsResolves to the current adopted revision.sync/industrial-control-panels, Battery Energy Storage SystemsBattery Energy Storage SystemsResolves to the current adopted revision.sync/battery-energy-storage-systems, Uninterruptible Power Supply SystemsUninterruptible Power Supply SystemsResolves to the current adopted revision.sync/uninterruptible-power-supply-systems, and DC Battery SystemsDC Battery SystemsResolves to the current adopted revision.sync/dc-battery-systems
  • equipment on the utility's side of the point of delivery, and the arc-flash practices of the utility's own workers under OSHA 29 CFR 1910.269
1.5 The study shall calculate the incident energy and the arc-flash boundary at every bus within the study boundary described under Buses Studied, in every operating case and maintenance-mode case this standard requires, with the clearing time taken from the coordination settings accepted under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study.

2 Referenced Standards

2.1 The study, its model, and its report shall comply with the latest adopted edition of each of the following unless a specific edition is cited.
2.2 Where the contract documents, the adopted edition of NFPA 70, the Owner's electrical safety program, or two referenced standards impose conflicting requirements, the more stringent requirement shall govern unless the Engineer of Record directs otherwise in writing.
Standard Title
IEEE 1584-2018 Guide for Performing Arc-Flash Hazard Calculations
IEEE 1584.1 Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584
NFPA 70 National Electrical Code (Articles 110.16, 110.24, 240.67, 240.87, and 409.110)
NFPA 70E Standard for Electrical Safety in the Workplace (Article 130 and Informative Annex D)
NFPA 70B Standard for Electrical Equipment Maintenance
OSHA 29 CFR 1910.333 Selection and Use of Work Practices (Subpart S, Electrical)
OSHA 29 CFR 1910.335 Safeguards for Personnel Protection (Subpart S, Electrical)
IEEE 551 Recommended Practice for Calculating AC Short-Circuit Currents in Industrial and Commercial Power Systems (Violet Book)
IEEE 242 Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (Buff Book)
IEEE C37.010 Application Guide for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis
IEEE C37.13 Low-Voltage AC Power Circuit Breakers Used in Enclosures
IEEE C37.20.7 Guide for Testing Switchgear Rated Up to 52 kV for Internal Arcing Faults
UL 489 Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures
UL 248 Low-Voltage Fuses
ANSI Z535.4 Product Safety Signs and Labels
ASTM F1506 Standard Performance Specification for Flame Resistant and Electric Arc Rated Protective Clothing Worn by Workers Exposed to Flames and Electric Arcs

3 Submittals

3.1 Action Submittals

3.1.1 The Contractor shall submit the following for review by the Engineer of Record:
  • the qualifications of the study engineer, giving the license, the firm, and the comparable studies described under Study Engineer
  • the study plan, giving the calculation method, the analysis software and its version, the buses to be studied as a preliminary one-line diagram carrying the bus identifiers the labels will use, the source operating cases and maintenance-mode cases to be run, the basis for the electrode configuration, enclosure dimensions, bus gap, and working distance at each equipment class, the method to be applied at any bus outside the IEEE 1584-2018 range, and the schedule of each issue against the acceptance of the coordination study and the energization date
  • a statement that the coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study has been accepted, naming its revision, before the final issue is prepared
  • the study report described under Study Report, at each issue the datasheet selects under Study Issues
  • the label schedule described under Label Schedule, for the final issue
Action Submittalscheckbox
☑ Study engineer qualifications
☑ Study plan with preliminary one-line diagram
☑ Coordination study acceptance statement
☑ Study report at each issue
☑ Label schedule
3.1.2 The study plan shall be reviewed and returned before the arc-flash calculation is run, and the final report shall not be submitted until the plan covering it has been returned.
NOTE The study plan settles, before any case is run, the questions that otherwise surface when the labels are already printed: which buses are in and which are out, which operating states the worker will meet, whether the enclosure sizes are typical or measured, and whether the study will be back before the equipment is energized. A plan returned with the boundary drawn and the cases named is what makes the labels a record of the system rather than a best guess at it. (3.1.3)

3.2 Closeout Submittals

3.2.1 The Contractor shall submit the following before the equipment within the study boundary is energized:
  • the final study report, confirmed against the as-left settings record of Electrical Acceptance TestingElectrical Acceptance TestingResolves to the current adopted revision.sync/electrical-acceptance-testing where the datasheet selects a confirmation under Study Issues, and otherwise re-issued with a reconciliation of the settings used against the settings accepted
  • the native model files of the analysis software, with the software version and device library revision that produced the report
  • the final label schedule, as the record of every value printed on every arc-flash label
  • the PPE arc rating table described under PPE Arc Rating, written for the Owner's electrical safety program
  • the re-study trigger list described under Review and Re-Study Triggers, written for the Owner's operations staff
Closeout Submittalscheckbox
☑ Final study report confirmed against the as-left settings
☑ Native model files with software version and library revision
☑ Final label schedule
☑ PPE arc rating table
☑ Re-study trigger list
3.2.2 The native model files shall be delivered in a form the Owner can open and edit with a licensed copy of the software, without a password, a locked library, or a dependency on the study engineer's account.
NOTE The label on the door is read for the life of the equipment, and the five-year review and every re-study open the model that produced it. A review that has to rebuild the model from the PDF re-enters every enclosure size, gap, and working distance by hand, and a value that drifts in the re-entry prints on a new label as a fact. (3.2.3)

4 Quality Assurance

4.1 Study Engineer

4.1.1 The study shall be performed by the study engineer indicated in the datasheet.
Study Engineerselect
Engineer performing the short-circuit and coordination studies
Engineer of Record
Independent engineer engaged by the Contractor
Equipment manufacturer's engineering services
Testing organization's engineering group
NOTE The engineer who performed the short-circuit and coordination studies already holds the model, the assumption register, and the settings the arc-flash calculation reads, and runs the arc-flash study as a third pass on the same file, which is why that arrangement is the one on nearly every project; the other four arrangements are the ones the short-circuit study offers for its own engineer, with the same trade-offs recorded under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study, and a project selects one of them here where the arc-flash study is procured separately, as when an Owner engages an independent engineer to label an existing facility whose studies were performed by others. (4.1.2)
4.1.3 The study shall be performed under the responsible charge of a Professional Engineer licensed in the jurisdiction of the project, and the report, the one-line diagram, the results tables, and the label schedule shall bear that engineer's seal and signature.
4.1.4 The study engineer shall have performed not fewer than five arc-flash studies to IEEE 1584-2018 on systems of the same voltage class and of comparable size within the five years before the study, and shall name them in the qualifications.
4.1.5 Where the study engineer is not the engineer who performed the coordination study, the study shall be built on the accepted short-circuit model handed over under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study and on the accepted settings of Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study, and the study engineer shall report every departure from either to the Engineer of Record before the final issue.
4.1.6 Where the equipment manufacturer's engineering services perform the study, the model shall include every source, bus, and protective device within the study boundary, whether or not the manufacturer furnished it, and a study limited to the manufacturer's own equipment shall not be accepted.
4.1.7 Where the study engineer is not the Engineer of Record, the Engineer of Record shall review the study report and return it before any label is printed from it.
4.1.8 Where the study engineer and the Engineer of Record disagree on an input value, an assumption, or the treatment of a bus, the Engineer of Record shall make the determination and the study shall record it in the assumption register.

4.2 Study Issues

4.2.1 The study shall be issued at each point in the project indicated in the datasheet.
Study Issuescheckbox
☐ Preliminary issue on design data before equipment release
☑ Final issue on the accepted coordination settings before energization
☑ Confirmation against the as-left settings record after acceptance testing
NOTE A preliminary issue on design data and preliminary settings is run while the equipment can still change, and it is the issue that decides whether a main section needs arc-resistant construction, a maintenance switch, or a faster upstream fuse before the switchgear is ordered; the final issue on the accepted coordination settings is the one every label is printed from; the confirmation against the as-left settings record compares the settings the study used with the settings the testing organization recorded at each device, re-runs the buses where they differ, and is the step that keeps a trip unit left at its shipping setting from invalidating a label that says otherwise. (4.2.2)
4.2.3 The final issue shall not be run until the coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study has been accepted in writing, and a preliminary issue shall state on its cover and on every results table that its values are not to be printed on a label.
4.2.4 Where a confirmation is selected, the study engineer shall compare the setting of every device in the model against the as-left settings record delivered under Electrical Acceptance TestingElectrical Acceptance TestingResolves to the current adopted revision.sync/electrical-acceptance-testing, shall re-run every bus whose clearing device differs, and shall re-issue the report and the label schedule for those buses before the equipment is energized.
4.2.5 Where a confirmation is not selected, the Contractor shall deliver the as-left settings record to the Engineer of Record with the closeout submittals, and the Engineer of Record shall direct a re-run of any bus whose clearing device is found set other than the study assumed.
4.2.6 No arc-flash label shall be printed from a preliminary issue, from a study run on settings that have not been accepted, or from a study whose model has been superseded under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study.
NOTE An arc-flash label is a statement about one device: that it will clear an arcing fault in the time the study read from its curve. A device set to a different value clears in a different time, and the label on the door is then wrong by a factor the worker cannot see. The sequence, settings accepted, settings applied, settings recorded, study confirmed, labels printed, is what makes the number on the door the number in the room. (4.2.7)

4.3 Calculation Tool

4.3.1 The study shall be performed with the calculation tool indicated in the datasheet.
Calculation Toolradio
● Commercial power system analysis software on the model handed over from the short-circuit and coordination studies
○ Independent calculation of the IEEE 1584-2018 equations from the accepted short-circuit and coordination reports
NOTE Commercial analysis software reads the arcing current off the device curve, applies the arcing current variation and the enclosure size correction of IEEE 1584-2018 at every bus without transcription, and keeps the arc-flash results in the same file the next re-study opens, which is why it is the tool on nearly every study; an independent calculation of the IEEE 1584-2018 equations, in a spreadsheet or by hand from the bolted fault currents and the clearing times tabulated in the two accepted reports, is reproducible by any engineer with those reports and is the tool a project accepts where the system is a single service with a handful of buses and the short-circuit study was itself a hand calculation, with the result that there is no model file to hand to the next review. (4.3.2)
4.3.3 Where software is selected, the report shall identify the software, its version, and the revision of the device library used, and the Contractor shall not name the software in the study plan as a condition of the work.
4.3.4 Where software is selected, the study engineer shall verify the software result by an independent calculation of the IEEE 1584-2018 equations at the service equipment and at one bus on the secondary of each transformer class in the system, and shall include the verification in the report.
4.3.5 Where an independent calculation is selected, the report shall show at every bus the bolted fault current, the arcing current and its reduced value, the clearing time read at each, the intermediate values of the IEEE 1584-2018 equations, the enclosure size correction factor, and the incident energy and arc-flash boundary that result, so that every value can be reproduced from the report alone.

5 Calculation Basis

5.1 IEEE 1584-2018 Model

5.1.1 The incident energy and the arc-flash boundary at every three-phase AC bus within the range of the IEEE 1584-2018 model shall be calculated by that model, with the electrode configuration, enclosure dimensions, bus gap, and working distance for the bus as established under Arc-Flash Input Data.
NOTE The IEEE 1584-2018 model is empirical, built from a test program that spanned three-phase systems from 208 V through 15 kV, bolted fault currents from 500 A to 106 kA at 600 V and below and from 200 A to 65 kA above 600 V, electrode gaps from 6.35 mm to 76.2 mm at low voltage and from 19.05 mm to 254 mm at medium voltage, working distances of 305 mm and more, and five electrode configurations. Within that range it predicts the arcing current, the incident energy, and the arc-flash boundary from the bolted fault current, the voltage, the gap, the enclosure, the configuration, the working distance, and the arc duration; outside it, the equations are extrapolating from data they were never fitted to, which is why the study has to know, bus by bus, which side of the range it is on. (5.1.2)
5.1.3 The study engineer shall confirm, for every bus, that the voltage, the bolted fault current, and the gap lie within the IEEE 1584-2018 range, and the results tables shall identify every bus that does not.
5.1.4 The model of IEEE 1584-2002, with its single arcing current and its exemption for circuits below 240 V, shall not be the basis of a new study or of a review, and a facility whose study on file was performed under the 2002 edition shall have it converted to the 2018 model at its next review.

5.2 Buses Outside the Model Range

5.2.1 At every bus outside the range of the IEEE 1584-2018 model, the incident energy and the arc-flash boundary shall be established by the method indicated in the datasheet.
Method for Buses Outside the IEEE 1584-2018 Rangeselect
Ralph Lee method of NFPA 70E Informative Annex D.2
IEEE 1584-2018 model extended to the bus by documented engineering judgment
No incident energy calculated and the bus labeled to be de-energized before work
NOTE The Ralph Lee method is a theoretical open-air calculation that overstates the incident energy at most buses, is the method the analysis software applies above 15 kV and on single-phase systems as a matter of course, and gives a conservative label at the cost of a conservative PPE requirement; extending the IEEE 1584-2018 model by judgment, as where a gap or a fault current lies just past the tested range, gives a realistic value at the cost of an assumption that the register has to carry and the reviewer has to accept; calculating nothing and labeling the bus to be de-energized before any work is the arrangement for a bus no one will ever open energized, as an outdoor transformer primary compartment, and it leaves the worker no number where the bus is opened anyway. The buses that commonly fall outside the range are the utility primary above 15 kV, single-phase equipment, and 208 V buses with a bolted fault current below 500 A. (5.2.2)
5.2.3 The method applied at each bus outside the range shall be named in the results tables beside that bus, and the assumption register shall record the input that places the bus outside the range.

5.3 Equipment Rated 240 V and Below

5.3.1 Every bus rated 240 V and below within the study boundary shall be calculated, whatever the kVA of the transformer that serves it, and the report shall not exempt a bus on the basis of transformer size.
NOTE IEEE 1584-2002 permitted a study to leave out circuits below 240 V fed by a single transformer under 125 kVA, and a generation of studies and labels was built on that exemption. IEEE 1584-2018 withdrew it. The 2018 edition notes only that a sustained arc is less likely on a three-phase system at 240 V and below where the bolted fault current is below 2000 A, and that note is a statement about the likelihood of an arc, not an exemption from calculating its energy. The 208 V panelboard on a 75 kVA transformer is the bus a maintenance electrician opens most often, and it is calculated and labeled like every other. (5.3.2)
5.3.3 Where a bus rated 240 V and below has a bolted fault current below 2000 A, the results tables shall state the bolted fault current beside the result, and the label shall carry the calculated incident energy.

5.4 DC Arc-Flash

5.4.1 The incident energy and the arc-flash boundary on the DC side of every battery, energy storage, photovoltaic, and rectifier system rated 100 V DC and more within the study boundary shall be established by the method indicated in the datasheet.
DC Arc-Flash Calculation Methodselect
Maximum power method of NFPA 70E Informative Annex D.5
Detailed arc model method of NFPA 70E Informative Annex D.5
Not performed, no DC equipment rated 100 V and more within the study boundary
NOTE The IEEE 1584-2018 model is an AC model and offers nothing for a battery string or a DC bus. The maximum power method of NFPA 70E Informative Annex D.5 takes the arc at the point of maximum power transfer, half the bolted DC fault current at half the system voltage, needs only the bolted fault current and the clearing time, and overstates the energy at every bus, which is the trade a project accepts for a method anyone can check; the detailed arc model method of the same annex calculates the arc resistance from the gap and the current by the published arc models, gives a lower and more realistic energy, and needs a gap for every DC bus and an iteration the software performs. On a project with no DC equipment at or above 100 V, the threshold below which NFPA 70E assigns no DC arc-flash PPE, the question does not arise, and the study states so. (5.4.2)
5.4.3 Where a DC method is selected, the DC bolted fault current at each DC bus shall be taken from the battery or energy storage manufacturer's published short-circuit current for the string furnished and from the inverter or rectifier manufacturer's published fault contribution, and the clearing time shall be read from the DC protective device at that current.
5.4.4 Where a DC method is selected, the study shall report the DC-side and the AC-side result separately for each enclosure that carries both, so that the equipment standard's label can state each, and the DC result shall state that the battery remains energized after the disconnecting means is opened.
5.4.5 Where a DC method is selected, the station battery under DC Battery SystemsDC Battery SystemsResolves to the current adopted revision.sync/dc-battery-systems, the battery of a UPS under Uninterruptible Power Supply SystemsUninterruptible Power Supply SystemsResolves to the current adopted revision.sync/uninterruptible-power-supply-systems, the energy storage system under Battery Energy Storage SystemsBattery Energy Storage SystemsResolves to the current adopted revision.sync/battery-energy-storage-systems, and the DC side of the photovoltaic system under Photovoltaic SystemsPhotovoltaic SystemsResolves to the current adopted revision.sync/photovoltaic-systems shall each be included where rated 100 V DC and more.

6 Buses Studied

6.1 Study Boundary

6.1.1 The study shall calculate the incident energy and the arc-flash boundary at every class of equipment indicated in the datasheet within the study boundary, at every item of that class that a worker is likely to examine, adjust, service, or maintain while energized.
Equipment Classes Studiedcheckbox
☑ Service equipment, switchgear, switchboards, and motor control centers
☑ Panelboards
☑ Transformer terminal compartments
☑ Motor controllers, drives, and disconnect switches
☑ Busway tap boxes and plug-in units
☑ Transfer switches
☑ Generator terminal boxes and paralleling switchgear
☑ UPS, energy storage, and photovoltaic inverter output terminals
☑ Industrial control panels
☑ Meter socket enclosures and current transformer cabinets
☐ Junction and pull boxes with splices or terminations
NOTE NFPA 70 110.16(A) names the equipment that carries an arc-flash warning, switchboards, switchgear, panelboards, industrial control panels, meter socket enclosures, and motor control centers, and then adds any other equipment likely to be worked on energized, and the list above is that clause written out for the equipment a project actually installs. A transformer terminal compartment and a current transformer cabinet sit on the line side of a main and are among the highest-energy buses in a system; a motor disconnect and a busway plug-in unit are opened energized more often than any switchboard; a junction box with a splice is the one class the project adds where its maintenance practice opens boxes under load, and leaves out where it does not. The classes a project leaves out are the ones no worker opens energized. (6.1.2)
6.1.3 Every bus studied shall be identified in the model, the report, the label schedule, and the one-line diagram by the designation the contract documents give the equipment at that bus, as shown on the one-line diagram.
6.1.4 The study boundary shall extend downstream to the last item of each class selected, and the report shall state, for every class selected, the point below which no bus is calculated and the reason.
6.1.5 Where equipment below the study boundary carries an arc-flash label under its equipment standard, the label shall carry the incident energy calculated at the bus that feeds it, with the working distance of that bus, and the label schedule shall identify the bus the value is taken from.

6.2 Line and Load Side of a Main Device

6.2.1 Where a section contains a main device, the study shall calculate the line side of the main, cleared by the next upstream device, and the load side of the main, cleared by the main, as two buses, and shall report each.
6.2.2 Where the line-side and load-side results of a section differ, the label schedule shall state the line-side value for the section unless the equipment standard requires each compartment to carry its own value, in which case the schedule shall state both and identify the compartment each applies to.
NOTE The main breaker protects everything below it and nothing above it. An arcing fault on its line terminals, in the incoming compartment, or on the bus of a transformer secondary, is cleared by the device on the primary side of the transformer, which sees the arcing current reduced by the turns ratio and often sits on its long-time curve for seconds. That is why the main section of a switchboard is routinely the highest-energy bus in a building, and why a single label for the section states the line-side value. (6.2.3)

7 Cases

7.1 Bolted Fault Current Cases

7.1.1 The study shall calculate every bus at the bolted fault current cases indicated in the datasheet, as delivered by the short-circuit study under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study.
Bolted Fault Current Casesradio
○ Maximum bolted fault current with the arcing current variation applied
● Maximum and minimum bolted fault current, each with the arcing current variation applied
NOTE A lower fault current does not mean a lower incident energy. The arcing current falls with the bolted current, and when it falls below the instantaneous pickup of the upstream device the clearing time jumps from a few cycles to the time-delay band or the long-time curve, and the energy rises with it. The maximum case with the arcing current variation catches that effect over the variation the model expects at one bolted current; the minimum case, with the utility at its minimum contribution and the motors and the smallest source configuration, catches it where the utility's own range is wider than the variation, as on a service fed from a weak or switched utility system. A project runs the maximum case alone where the short-circuit study delivered no minimum. (7.1.2)

7.2 Arcing Current Variation

7.2.1 At every bus the incident energy shall be calculated at the arcing current and at the reduced arcing current that the arcing current variation correction factor of IEEE 1584-2018 gives, each with the clearing time read at that current, and the higher of the two incident energies and the larger of the two arc-flash boundaries shall be reported for the bus.
7.2.2 The results tables shall show both arcing currents, both clearing times, and both incident energies at every bus, and a results table that shows one arcing current per bus shall not be accepted.
NOTE The arcing current variation replaces the fixed 0.85 multiplier of the 2002 edition with a correction that depends on the voltage, the gap, the configuration, and the fault current, and it is the step most often found missing in a study converted from a 2002 model by changing the edition setting. A bus whose reduced arcing current sits below a pickup that the full arcing current clears is a bus with two labels' worth of difference between the two runs. (7.2.3)

7.3 Source Operating Cases

7.3.1 The study shall calculate every bus in every operating case indicated in the datasheet that supplies it, and the highest incident energy at each bus across the cases the worker can meet shall be the value reported for the bus.
Source Operating Casescheckbox
☑ Utility source in normal configuration
☑ Each on-site generator or generator plant alone
☐ Utility and on-site generation paralleled
☐ Ties closed between services or transformers
☐ UPS, energy storage, and photovoltaic sources in bypass and in inverter operation
☐ Maintenance bypass of paralleling switchgear and transfer equipment
NOTE A generator alone delivers less fault current than the utility and clears more slowly, because its decrement drops the arcing current into the time-delay bands of the devices below it, and the incident energy on generator power is routinely higher than on utility power at the same bus; the utility and the generation paralleled gives the sum of both at every bus between them and is the case for the paralleling bus and the main switchgear during a closed transition or in extended parallel operation; a tie closed between two services or two transformers doubles the source behind the common bus, and is a case whether or not the operating procedure forbids it, because the tie can be closed; a UPS or an inverter in bypass passes the upstream source through to loads that on inverter power see only the current limit; the maintenance bypass of paralleling switchgear or of a transfer switch puts a bus on a source and a clearing device it is never on in normal operation, and is the case the paralleling switchgear standard requires on the bypassed distribution's label. A case left out is a configuration in which a worker can open a door against a number no one has calculated. (7.3.2)
7.3.3 Where a case produces the highest incident energy at a bus only during a transfer or a closed transition and no worker performs an energized task in that state, the study engineer shall document the state and its result in the report and shall exclude it from the label value, with the exclusion recorded in the assumption register.
7.3.4 Where the equipment standard requires the label on an item of equipment to state more than one operating state, as the tie-open and tie-closed values on a double-ended substation or the bypass state on a paralleling switchgear, the study shall report each state separately and the label schedule shall carry each.
7.3.5 Where a generator source is calculated, the arcing current shall be read against the generator's decrement, and the clearing time shall be read from the device curve at the current the generator sustains at the time of clearing rather than at its subtransient current.

7.4 Maintenance-Mode Cases

7.4.1 At every bus whose clearing device carries an energy-reducing maintenance switch, the study shall calculate the incident energy with the switch in its normal state and in its maintenance state, and shall carry the results to the label as indicated in the datasheet.
Maintenance Switch Values on the Labelradio
● Normal-state and maintenance-state values both on the label
○ Maintenance-state value on the label with the instruction to place the switch in maintenance before opening
○ Normal-state value on the label and the maintenance-state value in the report
NOTE Both values on the label let the worker see what the switch buys and choose the PPE for the state the switch is in, at the cost of a label with two numbers that a worker in a hurry can read wrong; the maintenance-state value alone with the instruction to engage the switch first is the arrangement where the Owner's program makes engaging the switch a step of every energized task at that equipment and the switch's status light is visible with the door closed, and it leaves the worker unprotected on the day the switch is bypassed or failed; the normal-state value alone on the label treats the switch as a bonus the label does not count on, gives the most conservative PPE, and loses the reduction the switch was bought for. (7.4.2)
7.4.3 At every bus whose clearing device is in a zone-selective interlocking scheme, the study shall calculate the incident energy with the interlock active, and the report shall identify each such bus and shall state that the value depends on the interlock wiring being continuous and the scheme enabled.
7.4.4 At every bus whose clearing device is an energy-reducing active arc-flash mitigation system or an optical arc-flash relay, the study shall calculate the incident energy at the clearing time the manufacturer publishes for the system furnished, and shall also report the value with the system out of service.
7.4.5 At a bus in arc-resistant switchgear tested to IEEE C37.20.7, the study shall calculate and label the incident energy with the compartment door open, and the report shall state that the arc-resistant rating applies only with every door closed and latched.
NOTE The maintenance switch, the interlock, the active mitigation system, and the arc-resistant enclosure are furnished and tested under the equipment standards; this study calculates what each does to the energy at the bus and tells the worker which of them the label counts on. A label that quietly assumes an interlock that was never commissioned is the failure the per-bus statement of dependence exists to prevent. (7.4.6)

8 Arc-Flash Input Data

8.1 Data Inherited from the Short-Circuit Study

8.1.1 The bolted fault current, the X/R, the utility contribution, the transformer, conductor, busway, motor, generator, and inverter data, the source operating configurations, the existing-equipment survey, and the assumption register shall be taken from the accepted short-circuit study under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study, and the arc-flash study shall not collect, re-enter, or revise them.
8.1.2 Where the study engineer finds an input of the short-circuit model that the arc-flash results are sensitive to and believes to be wrong, the finding shall be reported to the Engineer of Record and to the short-circuit study engineer, and the model shall be revised under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study and both predecessor studies re-run before this study is issued on the revised model.
NOTE An arc-flash study collects four inputs the system model does not already carry, the electrode configuration, the enclosure dimensions, the bus gap, and the working distance at each bus, and everything else it reads is already in the model it inherits. A study that re-collects the utility letter and re-enters the transformer impedances is building a second model, and the two will differ by the time the labels are printed. (8.1.3)

8.2 Electrode Configuration

8.2.1 The electrode configuration at every bus shall be established on the basis indicated in the datasheet.
Electrode Configuration Basisselect
Per bus, from the construction of the equipment furnished or installed
VCB for enclosed equipment and VOA in open air throughout
Most severe enclosed configuration for each voltage class throughout
8.2.3 The configuration applied at each bus shall be stated in the results tables and in the label schedule, and where a compartment presents more than one configuration to a worker, the configuration giving the higher incident energy shall govern that bus.

8.3 Enclosure Dimensions

8.3.1 The enclosure height, width, and depth at every enclosed bus shall be established on the basis indicated in the datasheet, and the enclosure size correction factor of IEEE 1584-2018 shall be applied from them.
Enclosure Dimension Basisradio
● IEEE 1584-2018 typical enclosure dimensions by equipment class
○ Dimensions of the equipment furnished or installed, per bus
NOTE The typical enclosure dimensions IEEE 1584-2018 tabulates for each equipment class are the values nearly every study applies, because the correction factor is modest over the range of real enclosures and a measured dimension changes the energy at a bus by less than the uncertainty in its clearing time; the dimensions of the equipment furnished, taken from the shop drawings or measured at an existing item, are the basis a project selects where a compartment is far smaller than its class, as a shallow motor disconnect or a small junction box, where the correction factor rises with the smaller volume and the typical value understates the energy. (8.3.2)
8.3.3 Where the dimensions of the equipment furnished are selected, the dimensions shall be the inside dimensions of the compartment the worker opens, taken from the manufacturer's shop drawings for new equipment and from measurement for existing equipment, and recorded in the input data tables.

8.4 Bus Gap

8.4.1 The gap between conductors at every bus shall be established on the basis indicated in the datasheet.
Bus Gap Basisradio
● IEEE 1584-2018 typical gaps by equipment class and voltage
○ Gap of the equipment furnished or installed, per bus
NOTE The typical gaps IEEE 1584-2018 tabulates by equipment class and voltage, 25 mm for a low-voltage panelboard and motor control center, 32 mm for low-voltage switchgear, 104 mm for 5 kV switchgear and 152 mm for 15 kV switchgear, are the values nearly every study applies, because the gap enters the arcing current and the energy weakly over the range any one class spans; the gap of the equipment furnished, from the manufacturer's data or a measurement, is the basis a project selects at medium voltage, where the range across designs is wide and a 15 kV compartment built to a 104 mm gap is calculated at a 152 mm gap otherwise. (8.4.2)
8.4.3 Where the gap of the equipment furnished is selected, the gap shall be the shortest phase-to-phase clearance between exposed conductors in the compartment the worker opens, taken from the manufacturer's data for new equipment and from measurement for existing equipment, and recorded in the input data tables.

8.5 Working Distance

8.5.1 The working distance at every bus in a low-voltage panelboard, motor control center, controller, disconnect switch, busway plug-in unit, transfer switch, control panel, or junction box shall be the distance indicated in the datasheet.
Working Distance for Panelboards, Motor Control Centers, and Small Enclosuresrange
in
1218243648
8.5.2 The working distance at every bus in low-voltage switchgear and in a switchboard shall be the distance indicated in the datasheet.
Working Distance for Low-Voltage Switchgear and Switchboardsrange
in
1218243648
8.5.3 The working distance at every bus in medium-voltage switchgear and in a medium-voltage transformer or controller compartment shall be the distance indicated in the datasheet.
Working Distance for Medium-Voltage Equipmentrange
in
1218243648
NOTE The working distance is the distance from the arc to the worker's face and chest, and the incident energy falls with roughly the square of it, so the distance decides the label as much as the clearing time does. The three defaults, 18 in for a panelboard or a motor control center, 24 in for low-voltage switchgear and switchboards, and 36 in for medium-voltage switchgear, are the typical distances IEEE 1584-2018 tabulates and the ones the label is read at; a project shortens the distance at an equipment class where its tasks put the worker's face closer, as a panelboard mounted so that the worker crouches at it, and lengthens it only where every energized task at the class is performed with a tool that keeps the worker further away. (8.5.4)
8.5.5 Where a task at a bus is performed closer than the working distance of its equipment class, the study shall also report the incident energy at the task distance, and the label schedule shall carry the value at the equipment class distance with the task value in the report.
8.5.6 The working distance applied at each bus shall be stated in the results tables and shall be the distance printed on the label with the incident energy.

9 Clearing Time

9.1 Clearing Device and Settings

9.1.1 The arc duration at every bus shall be the clearing time of the device that clears an arcing fault at that bus, read from its time-current curve at the arcing current and at the reduced arcing current, at the settings accepted under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study.
9.1.2 The clearing device for a bus shall be the first device upstream of the exposed conductors the worker reaches, and a device in the same compartment as those conductors shall not be taken as clearing a fault on its own line side.
9.1.3 Where the clearing device is a circuit breaker whose published trip curve ends at the trip unit's signal to the breaker, the breaker's opening time, as the manufacturer publishes it and as IEEE C37.13 or UL 489 rates it, shall be added to the time read from the curve.
9.1.4 Where the clearing device is a current-limiting fuse or a current-limiting breaker operating in its current-limiting range at the arcing current, the clearing time and the incident energy shall be taken from the fuse or breaker manufacturer's published arc-flash data or from the total clearing curve, and the current-limiting let-through shall not be credited without that data.
9.1.5 Where the clearing device is a relay-operated breaker, the arc duration shall be the relay operating time at the arcing current plus the breaker interrupting time of IEEE C37.010 for its rated interrupting time, plus the time of any lockout or auxiliary relay in the trip path.
9.1.6 Where the clearing device is a transformer primary device clearing a fault on the secondary, the arcing current shall be reflected through the transformer ratio and connection before the curve is read.
9.1.7 Every setting the study reads shall be listed in the input data tables with the device, the setting, and the revision of the coordination study it was taken from, and a setting taken from any other source shall be identified as such and shall not be printed to a label.
NOTE The curve says when the trip unit decides; the arc ends when the contacts part and the arc inside the breaker goes out. For a low-voltage power breaker the difference is about three cycles, for a molded-case breaker about one, for a medium-voltage breaker three to five, and at a bus cleared on an instantaneous element it is most of the duration. A study that reads the curve and stops has every instantaneous bus wrong by a factor. (9.1.8)

9.2 Arc Duration Cap

9.2.1 Where the clearing device does not clear within two seconds at the arcing current, the arc duration shall be treated as indicated in the datasheet.
Arc Duration Capradio
● Two seconds where the worker can move away from the arc
○ Device clearing time without a cap
NOTE IEEE 1584-2018 and NFPA 70E Informative Annex D note that a worker exposed to an arc is likely to have moved out of its reach within about two seconds, and nearly every study caps the duration there at a bus cleared on a long-time curve, because the uncapped value, often hundreds of calories, is an energy no PPE addresses and the cap is what makes the label a number a worker can act on; calculating the full clearing time leaves the label with that energy, which is the honest statement at a bus from which the worker cannot step away. (9.2.2)
9.2.3 Where the cap is selected, it shall not be applied at a bus a worker reaches from a ladder, a lift, a pit, a crawl space, a confined space, or a position in which an enclosure or an obstruction prevents stepping back, and the study engineer shall identify each such bus from the equipment locations and calculate it at the full clearing time.
9.2.4 Every bus at which the cap is applied shall be identified in the results tables and in the report, with the uncapped clearing time shown beside the capped one.

10 Label Content and PPE

10.1 Label Method

10.1.1 The arc-flash label at every bus within the study boundary shall state the hazard by the method indicated in the datasheet, and shall not state it by both.
Label Methodradio
● Incident energy analysis method
○ Arc flash PPE category method of NFPA 70E Table 130.7(C)(15)
NOTE NFPA 70E 130.5(F) permits either the incident energy analysis method or the PPE category method on a given item of equipment and forbids both on the same one. The incident energy method prints the calculated energy at the working distance and is the method on every project that has performed this study, because the study exists to produce the number; the PPE category method prints a category from the tables of NFPA 70E 130.7(C)(15), which apply only to the equipment types, fault currents, and clearing times the tables list, and is selected where the Owner's program is built on categories and every bus falls within the table parameters. A label that prints a category beside a calculated energy invites the worker to pick whichever reads lower. (10.1.2)
10.1.3 Where the PPE category method is selected, the study shall confirm at every bus that the equipment type, the available fault current, and the clearing time lie within the parameters of NFPA 70E Table 130.7(C)(15), and shall label by the incident energy analysis method at every bus that does not.
10.1.4 The label method selected here shall be the method the Owner's electrical safety program under Electrical Safety ProgramElectrical Safety ProgramResolves to the current adopted revision.sync/electrical-safety-program selects, and where the two differ the Engineer of Record shall resolve the difference before the label schedule is issued.

10.2 Label Content

10.2.1 Each arc-flash label shall carry the content indicated in the datasheet, with every value taken from the label schedule for that bus.
Label Contentcheckbox
☑ Nominal system voltage
☑ Arc-flash boundary
☑ Incident energy at the working distance
☑ Working distance
☐ Minimum arc rating of PPE
☐ Site-specific PPE level
☐ Arc flash PPE category
☑ Limited approach boundary
☑ Restricted approach boundary
☑ Equipment designation matching the one-line diagram
☐ Protective device that clears the arc
☑ Date of the study
☐ Study report reference
10.2.2 Whatever the datasheet selects, each label shall carry at least the nominal system voltage, the arc-flash boundary, and one of the incident energy with its working distance, the minimum arc rating of PPE, the site-specific PPE level, or the PPE category, as NFPA 70E 130.5(H) requires, and a label on service or feeder equipment rated 1200 A and more shall also carry the date it reflects, as NFPA 70 110.16(B) requires.
10.2.3 Where the incident energy analysis method is selected, the label shall not carry a PPE category, and where the PPE category method is selected, the label shall not carry an incident energy value.
NOTE The voltage, the arc-flash boundary, and the energy or the category are the three things NFPA 70E requires on the door, and the rest is what makes the label usable without the report: the working distance tells the worker what the energy was calculated at, the shock boundaries from NFPA 70E Table 130.4 put the approach limits where the arc-flash boundary is, the designation ties the door to the one-line and the schedule, the clearing device tells the next engineer what the value depends on, and the date tells the reviewer whether the label is current. A study report reference is added where the Owner's program requires the worker to be able to find the calculation; a site-specific PPE level is added where the Owner's program names its levels. (10.2.4)
10.2.5 The limited and restricted approach boundaries printed on a label shall be those of NFPA 70E Table 130.4 for the nominal voltage of the bus, and the arc-flash boundary shall be the distance at which the incident energy is 1.2 cal/cm², calculated at the clearing time and arcing current that govern the bus.
10.2.6 Each label shall carry the signal word established under Signal Word and the values of the operating state or states the label is required to state under Source Operating Cases and Maintenance-Mode Cases.
10.2.7 The physical label, its material, its lettering, its pictogram, its attachment, and its location on each item of equipment are governed by Equipment LabelingElectrical Equipment LabelsResolves to the current adopted revision.sync/equipment-labeling, and the label shall be ordered and installed under that standard from the label schedule of this study and from no other source.

10.3 Signal Word

10.3.1 The signal word on each label shall be assigned on the basis indicated in the datasheet, and the label schedule shall state it for every bus.
Signal Word Basisselect
WARNING below 40 cal/cm² and DANGER at 40 cal/cm² and above
WARNING below the arc rating of the highest PPE in the Owner's program and DANGER at and above it
WARNING on every label
NOTE ANSI Z535.4 reserves DANGER for a hazard that will cause death or serious injury if not avoided and WARNING for one that could, and NFPA 70E leaves the threshold between them to the facility. Forty calories per square centimeter was for many editions the line above which NFPA 70E assigned no PPE category, and it remains the threshold most programs use for DANGER and for the rule that the bus is not worked energized, which is why it is the basis on nearly every study; setting the threshold at the arc rating of the highest PPE the Owner stocks puts DANGER exactly where the Owner's workers have no protection, which on a program stocked to 40 cal/cm² is the same line and on one stocked to 65 or 100 cal/cm² is a higher one; WARNING on every label reads the signal word as a hazard class rather than a severity and leaves the worker to read the energy, which is the practice of a program that treats every energized task alike. (10.3.2)
10.3.3 Every bus whose incident energy at the working distance reaches 40 cal/cm² shall be listed separately in the report's executive summary, whatever signal word the datasheet assigns it, so that the Owner's program can identify the buses it will not work energized.

10.4 PPE Arc Rating

10.4.1 The report shall tabulate, for every bus, the arc rating of PPE the incident energy at the working distance requires, stated as indicated in the datasheet, for the Owner's electrical safety program under Electrical Safety ProgramElectrical Safety ProgramResolves to the current adopted revision.sync/electrical-safety-program to select PPE from.
PPE Statement in the Reportcheckbox
☑ Minimum arc rating of PPE in cal/cm²
☐ Owner's site-specific PPE level
10.4.2 Where the Owner's site-specific PPE level is selected, the Owner shall furnish the arc rating of each level in the program before the final issue, and the study shall assign each bus the lowest level whose arc rating is not less than the incident energy at the working distance.
10.4.3 The minimum arc rating of PPE at a bus shall be not less than the incident energy at the working distance, as an arc rating under ASTM F1506 in cal/cm², and the table shall state the incident energy and the arc rating side by side.
NOTE The study produces the energy and the arc rating that meets it; the Owner's program decides which garments, which face protection, and which tasks go with each rating, and that division is why the table states the rating as a number and not as a garment. A site level is a convenience for a program that stocks three or four kits, and it is only as good as the arc rating the Owner attaches to it, which is why the Owner furnishes the ratings before the study assigns the levels. (10.4.4)

11 Mitigation

11.1 Mitigation Threshold

11.1.1 The report shall recommend mitigation at every bus whose incident energy at the working distance reaches the threshold indicated in the datasheet.
Mitigation Recommendation Thresholdrange
cal/cm²
1.248122540
NOTE A threshold of 40 cal/cm² confines the recommendations to the buses the Owner's program will not work energized and is the arrangement where the aim is to make every bus workable; 25 cal/cm² adds the buses that require the heaviest PPE a program commonly stocks; 8 or 12 cal/cm² adds the buses above the daily-wear arc rating of most programs and is the threshold of an Owner whose aim is to perform routine tasks in daily wear; 1.2 or 4 cal/cm² asks for a recommendation at nearly every bus and is the arrangement of a study procured specifically to design a mitigation program. The threshold moves the length of the recommendation list and not the results. (11.1.2)

11.2 Mitigation Options Evaluated

11.2.1 For every bus at or above the threshold, the report shall evaluate each mitigation option indicated in the datasheet that applies to the bus, and shall state for each the incident energy that would result, the cost class of the change, and the operating consequence.
Mitigation Options Evaluatedcheckbox
☑ Revised settings of the clearing device within the coordination constraints
☑ Energy-reducing maintenance switch on the clearing device
☑ Zone-selective interlocking between the clearing device and the devices below it
☐ Bus or transformer differential protection
☑ Current-limiting fuses or a current-limiting breaker ahead of the bus
☐ Optical arc-flash relay or active arc-flash mitigation system
☐ Arc-resistant switchgear construction
☑ Remote racking and remote operation outside the arc-flash boundary
☐ Relocation of the bus below a faster clearing device or a transformer
NOTE Every option on the list shortens the arc, moves the worker, or contains the blast, and each has a place. A revised setting costs nothing and is bounded by the selectivity the coordination study established; a maintenance switch cuts the energy only while a worker remembers to turn it on; zone-selective interlocking cuts it at every bus below the interlocked device at all times and needs wiring between the devices; differential protection clears a bus fault in a few cycles regardless of the arcing current and costs current transformers and a relay; a current-limiting fuse ahead of the bus ends the arc in a quarter cycle where the arcing current is in its current-limiting range and does nothing where it is not; an optical relay trips on the light of the arc in milliseconds; arc-resistant construction contains the arc with the doors closed and changes nothing with a door open; remote racking and operation move the worker outside the boundary for the tasks that start most arcs; relocating a bus below a faster device or a transformer is the design change that fixes the problem at the one-line. The options a project leaves off the list are the ones its equipment and its budget rule out before the study begins. (11.2.2)
11.2.4 The report shall present mitigation as recommendations ranked by the reduction each achieves, and the Owner and the Engineer of Record shall decide which to adopt; the study engineer shall not change the model, the settings, or the equipment to reflect a recommendation that has not been adopted in writing.
11.2.5 Where a recommendation is adopted, the equipment or setting change shall be made under the equipment standard or the coordination study that governs it, and the affected buses shall be re-run and re-issued under Study Revisions before the labels at those buses are printed.
NOTE The hierarchy of controls in NFPA 70E puts elimination of the energized task first and PPE last, and the mitigation list is the middle of that hierarchy: the engineering controls that lower the energy a worker meets when the task cannot be eliminated. A study that reports the energy and stops has told the Owner where the problem is; one that prices the options has told the Owner what to do about it, and that is what the recommendation list is for. (11.2.6)

12 Study Report

12.1 Report Content

12.1.1 The study report shall contain the following, in a single sealed document with numbered pages:
  • a cover page with the project, the system studied, the study engineer, the issue and its date, the revision history, and the seal and signature required under Study Engineer
  • an executive summary stating the study boundary, the method, the cases, the highest incident energy in the system and where it occurs, every bus at or above 40 cal/cm², and every bus outside the IEEE 1584-2018 range
  • a system description and the one-line diagram described under One-Line Diagram
  • the method statement, giving the IEEE 1584-2018 edition, the method applied outside its range, the DC method, the software and its version and library revision, the independent verification required under Calculation Tool, the arc duration cap and where it was applied, and the label method
  • the statement of the short-circuit study revision and the coordination study revision the study was built on
  • the input data tables for the electrode configuration, enclosure dimensions, bus gap, and working distance at every bus, each with its basis and source, and for every clearing device with its settings and their source
  • the assumption register, carried forward from the short-circuit study and extended with every assumption of this study
  • the results tables, giving at every bus, for every case, the bolted fault current, the arcing current and the reduced arcing current, the clearing device and the clearing time at each, the incident energy at each, the governing incident energy, the arc-flash boundary, the working distance, the signal word, and the PPE arc rating
  • the maintenance-mode results at every bus that has them, described under Maintenance-Mode Cases
  • the mitigation recommendations described under Mitigation
  • the label schedule described under Label Schedule
  • the PPE arc rating table described under PPE Arc Rating
  • the re-study trigger list described under Review and Re-Study Triggers
  • appendices holding the manufacturer data for the fuses, breakers, and mitigation systems whose published arc-flash data the study relied on
12.1.2 The results tables shall be organized by bus in the order of the one-line diagram, so that the reader can follow the incident energy from the service to any bus without searching the report.

12.2 One-Line Diagram

12.2.1 The report shall include a one-line diagram of the studied system showing every source, bus, protective device, and clearing relationship, with the designation of each bus as the contract documents give it, and at every bus the governing incident energy, the arc-flash boundary, and the working distance.
12.2.2 The one-line diagram shall carry the same bus identifiers as the short-circuit study, the coordination study, the results tables, the label schedule, and the labels, and no bus shall carry two identifiers across the three studies.
12.2.3 Where the system is too large for one sheet, the diagram shall be divided across sheets with cross-references at every cut, and no bus shall appear on two sheets with two different values.

12.3 Label Schedule

12.3.1 The report shall include a label schedule listing, for every item of equipment that is to carry an arc-flash label, the bus identifier, the equipment designation, the location, the compartment or section the label applies to, the operating state or states the label states, and every value the label is to carry under Label Content, with the signal word.
12.3.2 The label schedule shall be delivered in an editable tabular form in addition to the sealed report, so that the labels can be produced from it under Equipment LabelingElectrical Equipment LabelsResolves to the current adopted revision.sync/equipment-labeling without transcription.
12.3.3 The label schedule shall match the results tables in every value, and a label that disagrees with the schedule or a schedule that disagrees with the results tables is a defect of the study to be corrected before the label is installed.
NOTE The schedule is the handoff. The report is read by the engineer who reviews it; the schedule is read by the printer who makes the labels and by the electrician who installs them, and it has to carry everything they need in one row per door, so that no one is reading a value off a results table at the print shop. (12.3.4)

12.4 Report Format

12.4.1 The report shall be delivered in the formats indicated in the datasheet.
Report Formatcheckbox
☑ Sealed report in searchable PDF
☑ Native model files of the analysis software
☑ Label schedule in editable tabular form
☐ Editable one-line diagram in CAD format
☐ Bound printed copies
NOTE The sealed PDF is the record, the native model is what the five-year review opens, the editable schedule is what the labels are printed from, the editable one-line is what the Owner's drafting staff fold into the record drawings, and the printed copy is what sits in the electrical room with the safety program; a project adds the last two where its record-drawing and closeout practice call for them. (12.4.2)
12.4.3 Where the native model files are selected, they shall be delivered under the condition stated under Closeout Submittals, and the report shall name the software version that opens them.

13 Study Revisions and Review

13.1 Study Revisions Within the Project

13.1.1 The study engineer shall correct every calculation error and reporting error in the study that is identified before the end of the project's correction period, and shall re-issue the affected pages, the label schedule rows, and the native model, at no cost to the Owner.
13.1.2 The study shall be revised whenever, after the final issue and before the equipment within the study boundary is energized, the short-circuit model is revised under Short Circuit StudyShort-Circuit StudyResolves to the current adopted revision.sync/short-circuit-study, a setting is changed under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study, the as-left settings record differs from the settings used, a mitigation recommendation is adopted, or the equipment furnished at a bus differs in its configuration, enclosure, or gap from the equipment modeled, and the revision shall re-run every bus the change affects.
13.1.3 A revision caused by a substitution or a change in the equipment furnished or the settings applied by the Contractor shall be made at the Contractor's cost, and a revision caused by a change in the utility's value, an existing condition, or the design shall be made as the Engineer of Record directs under the change provisions of the contract.
13.1.4 Every revision shall carry a revision number and date on the cover, a list of the buses whose results changed, and a list of the labels to be replaced, and no label shall remain installed that carries a value a revision has superseded.

13.2 Review and Re-Study Triggers

13.2.1 The report shall state the interval, indicated in the datasheet, at which the Owner is to have the study reviewed for accuracy, and the interval shall not exceed the five years NFPA 70E 130.5(G) permits.
Periodic Review Intervalrange
Not more than
years
1235
NOTE Five years is the longest interval NFPA 70E permits between reviews and the one nearly every program adopts, on a facility whose change procedures bring every trigger event to the responsible engineer as it happens; a shorter interval is the arrangement of a facility that is reconfigured often, that has no change procedure capturing electrical work, or whose utility reinforces its system on a schedule the Owner does not see, and it buys a label that is checked before the system has drifted from it. (13.2.2)
13.2.3 The review shall confirm whether any trigger event has occurred since the study or its last review, shall re-run and re-label every bus a trigger event affects, and shall re-issue the report with the review date and the finding where no trigger event has occurred.
13.2.4 The report shall include a re-study trigger list, written for the Owner's operations staff, naming the events after which the Owner is to have the study updated before the affected equipment is returned to normal operation, and the list shall name at least the events indicated in the datasheet.
Re-Study Trigger Eventscheckbox
☑ Any event on the re-study trigger list of the short-circuit study
☑ Any event on the re-study trigger list of the coordination study
☑ A change to the setting of any device in the model
☑ Replacement of a protective device with one of a different make, frame, trip unit, or relay type
☑ A maintenance switch, interlock, or mitigation system added, removed, or found inoperative
☑ Replacement of equipment at a bus with equipment of a different configuration, enclosure, or gap
☑ A new operating configuration, tie, bypass, or parallel source
☑ A field condition found inconsistent with the model or the label
☑ Adoption of a mitigation recommendation
13.2.5 Where any trigger event occurs, the updated study shall be run on the updated short-circuit model and the updated coordination settings for the affected portion of the system, and the labels at every affected bus shall be replaced under Equipment LabelingElectrical Equipment LabelsResolves to the current adopted revision.sync/equipment-labeling before that portion is returned to normal operation.
13.2.6 The re-study trigger list shall be included in the operation and maintenance documentation of the electrical system, and the Owner's change procedures for the electrical system shall name the responsible engineer to be notified when a trigger event occurs.
NOTE The arc-flash label inherits every trigger of the two studies beneath it and adds its own, and most of them are ordinary maintenance: a trip unit replaced with the one in stock and left at its shipping setting, a maintenance switch bypassed to stop a nuisance trip, a panel replaced with a deeper one. None of them look like a reason to commission a study, which is why the list is written for the operations staff in the words of the work they do, and why the label carries its date. (13.2.7)

Written and maintained by SynC. Licensed under CC BY 4.0.