Site Grading and Subgrade Preparation

Revision 2 · SynC Standards Team — Specifier, SynC (SynC Platform Team / Platform Standards) ✓ Official · Jun 18, 2026 +2 −2

Adoption-parse fixes (YAML quoting, valid types, range defaults/min-max)
Showing changes from Rev 1 to Rev 2 in Site Grading and Subgrade Preparation.
---
title: Site Grading and Subgrade Preparation
353 unchanged lines
step: 1
default: 0
setpoints: [-2, 2]
+setpoints: [-2, 0, 2]
```
6 unchanged lines
step: 1
default: 0
setpoints: [-3, 3]
+setpoints: [-3, 0, 3]
```
257 unchanged lines
## Subgrade that has frozen after acceptance shall be allowed to thaw, then re-proof-rolled and re-tested before the next layer is placed.

View current revision