SynC · Editorial revision

Short-Circuit Study

Revision10
EditedOct 19, 2026
StatusCurrent
Contents

View changes in this revision   Revision history

Current revision. This is editorial revision 10, the current text of this standard. Read it on the standard's page.

Remake batch 25 and its neighbor re-points, batch 24 where missing, and the adopted-electrical-code parameter: brought in line with the authoring repository

1 Scope

NOTE This standard governs the short-circuit study as an engineering deliverable: the engineer who performs it and when it is delivered, the calculation method, the system model and the data it is built from, the cases studied, the evaluation of every rating the calculated duty is compared against, the available fault current data for the service equipment, the report, and the model that the coordination and arc-flash studies take over from it. (1.1)
NOTE NFPA 70 110.9 requires every device that interrupts fault current to have an interrupting rating not less than the current available at its line terminals, and 110.10 requires the conductors, the overcurrent devices, and the equipment of every circuit to withstand the fault current the overcurrent device lets through without extensive damage. OSHA 29 CFR 1910.303(b)(4) and (b)(5) state the same two requirements as a condition of the workplace. Neither can be shown from a nameplate; both rest on a calculation of the current available at every point in the system, and this study is that calculation. (1.2)
NOTE The short-circuit study is the first of three studies performed on the same system model. It establishes the magnitude of the fault current at every bus and the X/R ratio behind it; the coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study uses those currents to set the protective devices so that the nearest one clears; and the arc-flash study under Arc Flash StudyArc-Flash StudyResolves to the current adopted revision.sync/arc-flash-study turns the bolted fault current and the clearing time at each bus into incident energy. A change to this study's model moves both of the others, which is why the model and the results are delivered in a form the other two can take over without rebuilding. (1.3)
NOTE The following are governed elsewhere and are outside this standard: (1.4)
  • the protective device settings and the time-current coordination they achieve, under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study, which takes the accepted short-circuit study as its input and does not start without it
  • the incident energy, the arc-flash boundary, and the arc-flash labels, under Arc Flash StudyArc-Flash StudyResolves to the current adopted revision.sync/arc-flash-study, which takes the bolted fault currents from this study and the clearing times from the coordination study
  • the field tests that verify the installed equipment and its settings before energization, under Electrical Acceptance TestingElectrical Acceptance TestingResolves to the current adopted revision.sync/electrical-acceptance-testing
  • the ratings the equipment is ordered to, which each equipment standard carries in its own datasheet and this study confirms, under Low Voltage SwitchgearLow Voltage SwitchgearResolves to the current adopted revision.sync/low-voltage-switchgear, Medium Voltage SwitchgearMedium Voltage SwitchgearResolves to the current adopted revision.sync/medium-voltage-switchgear, Low Voltage SwitchboardsLow Voltage SwitchboardsResolves to the current adopted revision.sync/low-voltage-switchboards, PanelboardsPanelboardsResolves to the current adopted revision.sync/panelboards, Motor Control CentersMotor Control CentersResolves to the current adopted revision.sync/motor-control-centers, BuswayBuswayResolves to the current adopted revision.sync/busway, Automatic Transfer SwitchesAutomatic Transfer SwitchesResolves to the current adopted revision.sync/automatic-transfer-switches, Generator Paralleling SwitchgearGenerator Paralleling SwitchgearResolves to the current adopted revision.sync/generator-paralleling-switchgear, Secondary Unit SubstationsSecondary Unit SubstationsResolves to the current adopted revision.sync/secondary-unit-substations, and the other equipment standards that name this study
  • the utility point of delivery and the rules that apply at the service, under Electrical Service EntranceElectrical Service EntranceResolves to the current adopted revision.sync/electrical-service-entrance, the service conductors, under Distribution Feeder CablesService and Feeder ConductorsResolves to the current adopted revision.sync/distribution-feeder-cables, and the service equipment as products, under Low Voltage SwitchboardsLow Voltage SwitchboardsResolves to the current adopted revision.sync/low-voltage-switchboards, Low Voltage SwitchgearLow Voltage SwitchgearResolves to the current adopted revision.sync/low-voltage-switchgear, Enclosed Switches And DisconnectsEnclosed Switches and DisconnectsResolves to the current adopted revision.sync/enclosed-switches-and-disconnects, and PanelboardsPanelboardsResolves to the current adopted revision.sync/panelboards
  • the label at the service equipment, as a product, under the project's identification standard (see Equipment LabelingElectrical Equipment LabelsResolves to the current adopted revision.sync/equipment-labeling); this study supplies the available fault current value and the date that go on it
  • the grounding electrode system, the bonding, and the system grounding method of each source, under Grounding And BondingGrounding and Bonding for Electrical SystemsResolves to the current adopted revision.sync/grounding-and-bonding; this study models the grounding method the one-line diagram shows and calculates the ground-fault current that results
  • the short-circuit current rating determination of an industrial control panel, under Industrial Control PanelsIndustrial Control PanelsResolves to the current adopted revision.sync/industrial-control-panels; this study compares the marked rating with the available fault current at the panel
  • the facility's electrical safety program, under Electrical Safety ProgramElectrical Safety ProgramResolves to the current adopted revision.sync/electrical-safety-program, which a field survey of energized existing equipment is performed under
  • load-flow, voltage-drop, motor-starting, harmonic, and transient-stability studies, DC system fault calculations, and fault calculations on the utility's side of the point of delivery
1.5 The study shall extend from the utility point of delivery through every point within the study boundary described under Study Boundary and Calculation Points, on every source and in every operating case this standard requires.

2 Referenced Standards

2.1 The study, its model, and its report shall comply with the latest adopted edition of each of the following unless a specific edition is cited.
2.2 Where the contract documents, the adopted edition of NFPA 70, the serving utility's requirements, or two referenced standards impose conflicting requirements, the more stringent requirement shall govern unless the Engineer of Record directs otherwise in writing.
Standard Title
NFPA 70 National Electrical Code (Articles 110, 240, 409, 440, 700, 701, 705, and 708)
NFPA 70E Standard for Electrical Safety in the Workplace
OSHA 29 CFR 1910.303 General Requirements (Subpart S, Electrical)
IEEE 551 Recommended Practice for Calculating AC Short-Circuit Currents in Industrial and Commercial Power Systems (Violet Book)
IEEE 3002.3 Recommended Practice for Conducting Short-Circuit Studies and Analysis of Industrial and Commercial Power Systems
IEEE 141 Recommended Practice for Electric Power Distribution for Industrial Plants (Red Book)
IEEE 241 Recommended Practice for Electric Power Systems in Commercial Buildings (Gray Book)
IEEE 242 Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems (Buff Book)
IEEE C37.010 Application Guide for AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis
IEEE C37.04 Rating Structure for AC High-Voltage Circuit Breakers
IEEE C37.06 AC High-Voltage Circuit Breakers Rated on a Symmetrical Current Basis, Preferred Ratings and Related Required Capabilities
IEEE C37.5 Guide for Calculation of Fault Currents for Application of AC High-Voltage Circuit Breakers Rated on a Total Current Basis
IEEE C37.13 Low-Voltage AC Power Circuit Breakers Used in Enclosures
IEEE C37.20.1 Metal-Enclosed Low-Voltage Power Circuit Breaker Switchgear
IEEE C37.20.2 Metal-Clad Switchgear
IEEE C57.12.00 General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.01 General Requirements for Dry-Type Distribution and Power Transformers
UL 489 Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures
UL 248 Low-Voltage Fuses
UL 508A Industrial Control Panels (Supplement SB)
UL 1008 Transfer Switch Equipment
UL 1449 Surge Protective Devices
ICEA P-32-382 Short-Circuit Characteristics of Insulated Cable
IEC 60909-0 Short-Circuit Currents in Three-Phase AC Systems, Calculation of Currents

3 Submittals

3.1 Action Submittals

3.1.1 The Contractor shall submit the following for review by the Engineer of Record:
  • the qualifications of the study engineer, giving the license, the firm, and the comparable studies described under Study Engineer
  • the study plan, giving the calculation method, the analysis software and its version, the duty networks, fault types, and operating cases to be calculated, the study boundary as a preliminary one-line diagram carrying the bus and device identifiers the report will use, the source of each class of input data, and the schedule of the study against the release dates of the equipment whose ratings it confirms
  • the study report described under Study Report, at the point in the project the datasheet selects under Study Delivery
  • where the study is delivered before equipment release, a confirmation table listing each item of equipment whose rating the study confirms, by its designation on the one-line diagram, with the calculated duty, the rating proposed in the equipment submittal, and the result
Action Submittalscheckbox
☑ Study engineer qualifications
☑ Study plan with preliminary one-line diagram
☑ Study report
☑ Equipment rating confirmation table by designation
3.1.2 The study plan shall be reviewed and returned before the model is built, and the study report shall not be submitted until the plan covering it has been returned.
NOTE The study plan settles, before any data is entered, the questions that otherwise surface when the report is rejected: which buses are in the model and which are not, which cases are run, whose data the model is built from, and whether the study will be back before the switchgear order has to go. A plan returned with the boundary drawn and the schedule tied to the equipment release dates is what makes the study a gate the equipment order waits for rather than a document that arrives after it. (3.1.3)

3.2 Closeout Submittals

3.2.1 The Contractor shall submit the following before the equipment within the study boundary is accepted:
  • the final study report, revised to the as-built system where the datasheet selects an as-built update under Study Delivery, and otherwise re-issued with a reconciliation of the submittal-phase model against the equipment furnished and the conductor lengths installed
  • the native model files of the analysis software, with the software version and device library revision that produced the report
  • the available fault current and the date of the calculation for each item of service equipment within the study boundary, as the record that NFPA 70 110.24 requires to be documented and kept available
  • the re-study trigger list described under Study Revisions and Re-Study Triggers, written for the Owner's operations staff
  • the utility's written statement of available fault current and the manufacturer data sheets and test reports the model is built from
Closeout Submittalscheckbox
☑ Final study report with as-built reconciliation
☑ Native model files with software version and library revision
☑ Available fault current record for each item of service equipment
☑ Re-study trigger list
☑ Utility statement and source data
3.2.2 The native model files shall be delivered in a form the Owner can open and edit with a licensed copy of the software, without a password, a locked library, or a dependency on the study engineer's account.
NOTE A short-circuit model is rebuilt from scratch whenever the native file is lost, and rebuilt wrong whenever the one-line and the data tables in the PDF disagree with what was actually modeled. The native file is the study; the report is a printout of it. (3.2.3)

4 Quality Assurance

4.1 Study Engineer

4.1.1 The study shall be performed by the study engineer indicated in the datasheet.
Study Engineerselect
Engineer of Record
Independent engineer engaged by the Contractor
Equipment manufacturer's engineering services
Testing organization's engineering group
NOTE The Engineer of Record holds the design model and the utility correspondence and has no stake in the equipment, and performs the study where the fault currents are needed in design to size the equipment, with the result that the study is built on design data and is reconciled to the equipment furnished later; an independent engineer engaged by the Contractor is the arrangement where the study is a construction deliverable priced in the bid, built from the submittals of the equipment actually furnished, and reviewed by the Engineer of Record as a submittal; the equipment manufacturer's engineering services know their own equipment's ratings and series listings best and deliver the study with the switchgear order at the lowest added cost, and their model of the other makers' equipment, the conductors, and any existing system is only as good as the data handed to them; the testing organization's engineering group puts the study, the coordination settings, and the acceptance tests in one firm's hands, so that the party who sets the trip units built the model they were set from. No one arrangement is the norm across projects, and the choice turns on when the ratings are needed and who holds the data. (4.1.2)
4.1.3 The study shall be performed under the responsible charge of a Professional Engineer licensed in the jurisdiction of the project, and the report, the one-line diagram, and the results tables shall bear that engineer's seal and signature.
4.1.4 The study engineer shall have performed not fewer than five short-circuit studies on systems of the same voltage class and of comparable size within the five years before the study, and shall name them in the qualifications.
4.1.5 Where the equipment manufacturer's engineering services perform the study, the model shall include every source, bus, conductor, and device within the study boundary, whether or not the manufacturer furnished it, and a study limited to the manufacturer's own equipment shall not be accepted.
4.1.6 Where the study engineer is not the Engineer of Record, the Engineer of Record shall review the study report and return it before the ratings it confirms are relied on.
4.1.7 Where the study engineer and the Engineer of Record disagree on an input value, an assumption, or the evaluation of a result, the Engineer of Record shall make the determination and the study shall record it in the assumption register.

4.2 Study Delivery

4.2.1 The study shall be delivered at the point in the project indicated in the datasheet.
Study Deliveryselect
Before equipment release, on submittal data
After installation, on as-built data
Before equipment release, with an as-built update after installation
NOTE A study delivered before equipment release confirms every interrupting, withstand, and short-circuit current rating while the rating can still be changed on paper, which is why the equipment standards hold the release of switchgear, switchboards, panelboards, transfer switches, and drives for it, and it is built on submittal data and design conductor lengths that the installation departs from; a study delivered after installation is built on the nameplates and the lengths that exist, so its results are the ones the arc-flash labels and the record carry, and a rating it finds short is corrected by replacing equipment that is already installed; a study delivered before release and updated after installation gives both, at the cost of a second pass through the model and a second review, and is the arrangement a project chooses where the system is large, where the conductor routing is uncertain at the time of the submittals, or where the coordination and arc-flash studies will be run on the as-built model. (4.2.2)
4.2.3 Where the study is delivered before equipment release, no item of equipment whose interrupting rating, close-and-latch rating, short-time withstand rating, bus bracing, or marked short-circuit current rating the study confirms shall be released for manufacture until the study has been reviewed and returned without a deficiency against that item.
4.2.4 Where the study is delivered after installation, the equipment shall be ordered to the ratings the contract documents state, and the Contractor shall furnish the study before the equipment within the study boundary is energized.
4.2.5 Where an as-built update is selected, the update shall be issued after the equipment is installed and the conductors are pulled and before the equipment within the study boundary is energized, and the coordination study and the arc-flash study shall be run on the updated model.
NOTE The equipment standards that name this study hold the release of equipment for it, and a Contractor who releases equipment ahead of the study carries the cost of any rating the study then finds short. (4.2.6)

4.3 Calculation Tool

4.3.1 The study shall be performed with the calculation tool indicated in the datasheet.
Calculation Toolradio
● Commercial power system analysis software
○ Hand calculation by the method of IEEE 551
NOTE Commercial analysis software holds the model as a file that the coordination and arc-flash studies open next and that a re-study opens years later, carries the device and conductor libraries the model draws on, and applies the duty multipliers of the ANSI/IEEE method without transcription, which is why it is the tool on nearly every study; a hand calculation by the per-unit or ohmic method of IEEE 551 is reproducible by any engineer with the report in hand and is the tool a project accepts where the system is a single service, one or two transformers, and a handful of buses, with the result that there is no model file to hand to the next study. (4.3.2)
4.3.3 Where software is selected, the report shall identify the software, its version, and the revision of the device library used, and the Contractor shall not name the software in the study plan as a condition of the work.
4.3.4 Where software is selected, the study engineer shall verify the software result by a hand calculation at the service equipment and at one bus on the secondary of each transformer class in the system, and shall include the verification in the report.
4.3.5 Where hand calculation is selected, the report shall show every impedance in the calculation in per-unit on a stated base or in ohms at a stated voltage, the reduction of the network for each fault location, and the multipliers applied, so that every result can be reproduced from the report alone.

5 Calculation Basis

5.1 Calculation Method

5.1.1 The study shall be calculated by the method indicated in the datasheet.
Calculation Methodradio
● ANSI/IEEE method per IEEE 551
○ IEC 60909 method
NOTE The ANSI/IEEE method calculates the duty on each device in the terms its rating standard tests it in, with the first-cycle, interrupting, and time-delayed networks and the X/R multipliers of IEEE 551, IEEE C37.010, and IEEE C37.13, and it is the method for every system whose equipment is rated under IEEE and UL standards, which is every system this standard is written for in its home market; the IEC 60909 method calculates the initial symmetrical current, the peak current, the breaking current, and the steady-state current with the voltage factor c and the impedance correction factors of IEC 60909-0, and is the method for a system whose equipment is rated under IEC standards or whose owner's engineering practice is written to IEC. The two methods give different numbers for the same system and a rating tested under one is not evaluated against a current calculated under the other. (5.1.2)
5.1.3 Under the ANSI/IEEE method, the duty on each device shall be calculated from the network and with the multipliers that the standard the device is rated under assigns: IEEE C37.010 for a medium-voltage circuit breaker rated on a symmetrical current basis, IEEE C37.5 for an existing medium-voltage circuit breaker rated on a total current basis, IEEE C37.13 for a low-voltage power circuit breaker, and UL 489 and UL 248 for a molded-case circuit breaker and a fuse.
5.1.4 Under the IEC 60909 method, the study shall calculate the initial symmetrical short-circuit current, the peak short-circuit current, the symmetrical breaking current at the minimum time delay of each device, and the steady-state short-circuit current, with the voltage factor c of IEC 60909-0 for the maximum and the minimum case, and shall evaluate each device against the rating its standard states in those terms.
5.1.5 The report shall state the method in its executive summary and on the title block of every results table.

5.2 Duty Networks

5.2.1 Under the ANSI/IEEE method, the study shall calculate the duty networks indicated in the datasheet at every calculation point.
Duty Networks Calculatedcheckbox
☑ First-cycle network
☑ Interrupting network
☑ Time-delayed network
NOTE The three networks are one network with three sets of rotating-machine impedances. The first-cycle network, at one half cycle, carries every motor and generator at subtransient reactance with the IEEE 551 multipliers for motor size, and gives the current that a fuse, a molded-case breaker, a low-voltage power breaker, a bus brace, and the close-and-latch capability of a medium-voltage breaker are evaluated against; the interrupting network, at the contact-parting time of the breaker, lets the induction motor contribution decay by the IEEE 551 multipliers and gives the current a medium-voltage breaker interrupts; the time-delayed network, at about thirty cycles, drops the induction motors and places the generators at transient reactance, and gives the current a time-delayed relay sees and the current the minimum case is built from. On a system with no equipment above 1000 V the interrupting network adds nothing the first-cycle network does not already decide, and a project that leaves it out is leaving out a calculation the software performs anyway. (5.2.2)
5.2.3 The first-cycle network shall be used to evaluate every low-voltage interrupting rating, every bus bracing and short-time withstand rating, every marked short-circuit current rating, and the close-and-latch rating of every medium-voltage circuit breaker.
5.2.4 The interrupting network shall be used to evaluate the interrupting rating of every medium-voltage circuit breaker, at the contact-parting time IEEE C37.010 assigns to the breaker's rated interrupting time.
5.2.5 The time-delayed network shall be used for the current a time-delayed relay element sees and for the minimum case delivered to the coordination study.
5.2.6 Where the calculated X/R at a device exceeds the X/R the device's rating standard tests it at, the symmetrical current shall be multiplied by the factor that standard or the manufacturer's published application data assigns before it is compared with the rating.

5.3 Fault Types

5.3.1 The study shall calculate the fault types indicated in the datasheet at every calculation point.
Fault Types Calculatedcheckbox
☑ Three-phase bolted fault
☑ Single line-to-ground bolted fault
☐ Line-to-line bolted fault
☐ Double line-to-ground bolted fault
NOTE The three-phase bolted fault is the highest current at nearly every point of a system and is the case every interrupting and withstand rating is evaluated against; the single line-to-ground fault on a solidly grounded system can exceed the three-phase fault close to a wye-connected transformer or generator and is the current the ground-fault protection and the equipment grounding conductors are sized against; the line-to-line fault is about 87 percent of the three-phase value and is the lowest phase fault the coordination study uses as its minimum at the end of a feeder; the double line-to-ground fault is calculated where the ground-fault current through a grounded neutral is needed on a system whose grounding method makes it the larger case. On a resistance-grounded or ungrounded system the ground-fault current is set by the grounding resistor or the system capacitance rather than by the fault calculation, and the study reports it from the grounding design. (5.3.2)
5.3.3 The system grounding method of every source and separately derived system shall be modeled as shown on the one-line diagram, and the neutral grounding resistor or reactor of a resistance-grounded or reactance-grounded source shall be included in the zero-sequence network.
5.3.4 Every fault type calculated shall be reported with its symmetrical RMS current and its X/R at the fault location, and the three-phase fault shall also be reported with the asymmetrical current or the peak current that the device rating standard at that location evaluates against.

5.4 Maximum and Minimum Cases

5.4.1 The study shall calculate the cases indicated in the datasheet at every calculation point.
Cases Calculatedradio
○ Maximum fault current
● Maximum and minimum fault current
NOTE The maximum case decides every rating; the minimum case decides whether the protective devices see enough current to operate at the far end of a feeder, which is the coordination study's question, and sets the lower bound the arc-flash study applies its arcing-current reduction to. A study that reports the maximum only serves the equipment order and leaves the two studies that follow it to build their own minimum case from the same model, and a project accepts that where no coordination or arc-flash study will be run on the model. (5.4.2)
5.4.3 The maximum case shall be calculated with the utility at its stated maximum contribution and the growth margin applied, every on-site source that can operate in parallel with the utility connected, every motor contributing, every transformer at its minimum impedance, and every conductor at 20 °C.
5.4.4 The minimum case shall be calculated with the utility at the minimum contribution it states or, where it states none, at its maximum contribution, the on-site sources at the configuration that gives the lowest current at the bus, no motor contribution, every transformer at its maximum impedance, and every conductor at the conductor temperature its insulation is rated for.

5.5 Pre-Fault Voltage

5.5.1 Under the ANSI/IEEE method, the pre-fault voltage at every bus shall be the per-unit value indicated in the datasheet.
Pre-Fault Voltagerange
pu
11.051.1
NOTE A pre-fault voltage of 1.0 per unit at the bus nominal voltage is the value equipment is tested at and the value nearly every study uses; 1.05 per unit raises every result by 5 percent and is used where the system is operated above nominal voltage on a regulating transformer or a utility whose delivered voltage sits at the top of its range; 1.1 per unit matches the maximum voltage factor of IEC 60909-0 for a low-voltage system and is used where a study is to be compared with one calculated under IEC. (5.5.2)
5.5.3 Under the IEC 60909 method, the voltage factor c of IEC 60909-0 for the system voltage and the case shall apply in place of the pre-fault voltage of this article.

6 System Model

6.1 Study Boundary and Calculation Points

6.1.1 The study shall calculate the available fault current at every calculation point indicated in the datasheet within the study boundary.
Calculation Pointscheckbox
☑ Utility point of delivery and the service equipment line terminals
☑ Secondary terminals of every transformer
☑ Line terminals of every switchgear, switchboard, and motor control center
☑ Line terminals of every panelboard
☑ Line terminals of every motor controller, starter, and drive
☑ Each end of every busway run and each plug-in unit
☑ Both source terminals and the load terminals of every transfer switch
☑ Terminals of every generator, UPS, and energy storage source
☑ Line terminals of every control panel and other utilization equipment with a marked short-circuit current rating
☑ Line terminals of every surge protective device
☐ Points of common coupling designated for a harmonic evaluation
☐ Other points designated by the Engineer of Record
NOTE Every point at which a rating is confirmed is a calculation point, and the list is long because the ratings are many: the service equipment and every distribution assembly for their interrupting ratings and bus bracing, every transfer switch for its withstand and closing rating from each source, every busway run for its bracing at the source end and every plug-in unit for its rating at the opening, every controller, drive, control panel, and surge protective device for its marked short-circuit current rating, and every source terminal for the breaker that protects the source. A point of common coupling is added where a drive or a harmonic filter is evaluated under IEEE 519, because the ratio of the short-circuit current to the demand current at that point sets the harmonic limit. The points a project leaves out are the ones whose equipment has no rating to confirm. (6.1.2)
6.1.3 Every calculation point shall be identified in the model, the report, and the one-line diagram by the designation the contract documents give the equipment at that point.
6.1.4 Where the model terminates at a bus and the equipment below it is evaluated from that bus, the report shall state the termination and shall evaluate the equipment below it against the current at the bus.

6.2 Utility Source

6.2.1 The utility's available fault current at the point of delivery shall be taken from the basis indicated in the datasheet.
Utility Available Fault Current Basisselect
Written statement from the serving utility for the point of delivery
Utility's published standard value for the service class
Infinite bus at the primary terminals of the service transformer
NOTE A written statement from the utility gives the three-phase and line-to-ground contribution and the X/R at the point of delivery for the system as it exists or as the utility plans it, is the basis on nearly every study, and takes a written request and a lead time the study plan has to allow for; a published standard value is what some utilities state for every service of a class in place of a site value, is already a planning maximum, and gives no X/R and no minimum, which the study then assumes; an infinite bus at the primary terminals of the service transformer takes the transformer impedance as the only limit on the current, gives the highest value that transformer can pass, is the basis where the utility provides nothing in time or where the service transformer is the project's and the utility's contribution behind it is large relative to it, and cannot be used where the utility delivers at the equipment voltage with no transformer between. (6.2.2)
6.2.3 The Contractor shall request the available three-phase and line-to-ground fault current, the X/R ratio of each, and any minimum or future value the utility holds, in writing from the serving utility for the point of delivery, and shall include the request and the response in the report.
6.2.4 Where the study is delivered on a basis other than the utility's written statement and the statement is received before the equipment within the study boundary is energized, the study engineer shall re-run the maximum case with the utility's value and shall re-issue every result that changes.
6.2.5 The utility contribution used in every maximum case shall be the utility's value increased by the growth margin indicated in the datasheet.
Utility Contribution Growth Marginrange
%
51015202550
NOTE Utility fault current rises over the life of a building as the utility reinforces its system, and equipment ordered today is rated for the contribution stated today. A margin of zero takes the utility's value as given, which is the practice where the utility states a planning or ultimate value rather than a present one; a margin of 10 to 25 percent buys headroom against a reinforcement the utility has not announced, at the cost of the next higher interrupting rating at the service and sometimes one level down; a margin of 50 percent approaches the infinite-bus result on a stiff system and is the figure a project reaches for where the utility has told it a substation upgrade is planned and has not quantified it. (6.2.6)
6.2.7 The growth margin shall be recorded in the assumption register as a design decision of the study, and the available fault current record for the service equipment shall state the utility's value and the margin separately.

6.3 Transformers

6.3.1 Every transformer in the model shall be entered with its rated kVA, its primary and secondary voltages and connection, its percent impedance on its own base, and its X/R ratio, taken from the nameplate or the certified test report of the unit furnished where available.
6.3.2 Where the tested impedance of a transformer furnished under the project is not yet available, the study shall use the design impedance stated in the submittal, reduced by the manufacturing tolerance IEEE C57.12.00 or IEEE C57.12.01 permits for the maximum case and increased by it for the minimum case, and the as-built reconciliation shall replace both with the tested value.
6.3.3 Where no impedance is available for an existing transformer, the study shall use the standard impedance that IEEE C57.12.00 or IEEE C57.12.01 assigns to a unit of its kVA and voltage class, reduced by the tolerance for the maximum case, and shall record the substitution in the assumption register.
6.3.4 Where a transformer's X/R is not published, the study shall use the typical X/R for its kVA from IEEE 551 or IEEE 242 and shall record the substitution.
NOTE A transformer's impedance is the single value that most decides the fault current on its secondary, and a tolerance of 7.5 percent on the impedance is about 8 percent on the secondary fault current. A transformer whose test report shows a lower impedance than its design value is the common way a secondary switchboard ordered to a submittal-phase study ends up with no margin, which is why the tolerance is taken in the maximum case until the tested value is in hand. (6.3.5)

6.4 Conductors and Busway

6.4.1 Every conductor and busway run between two calculation points shall be modeled with its resistance and reactance taken from the source indicated in the datasheet, for its conductor material, size, number of conductors per phase, insulation, and raceway material.
Conductor Impedance Sourceradio
● Published typical values for the conductor size, material, and raceway type
○ Manufacturer's published values for the conductor furnished
NOTE Published typical values, the tables of IEEE 141 and IEEE 241 or the conductor library of the analysis software built from them, are available at the time the study is run and differ from the furnished conductor by less than the uncertainty in its length, which is why they are the source on nearly every study; the manufacturer's published values for the conductor furnished are the source where the conductor is a cable type with an impedance the tables do not carry, such as a shielded medium-voltage cable, a large interlocked-armor cable, or a busway, or where the study is an as-built update and the submittals are in hand. Busway impedance is the manufacturer's value in every case, because no table generalizes across busway designs. (6.4.2)
6.4.3 The reactance of a conductor shall be modeled for the raceway material it is installed in, magnetic or non-magnetic, and the model shall carry the raceway material of each run.
6.4.4 Conductor lengths shall be taken from the routing on the contract documents for a study delivered before equipment release and from the installed routing for an as-built study or an as-built update, and the length used for each run shall be listed in the input data tables.
6.4.5 A conductor whose length is not known shall be modeled at the shortest length consistent with the equipment locations for the maximum case, and the assumption register shall record it.
NOTE Conductor impedance is what separates the fault current at a panelboard from the fault current at the switchboard that feeds it, and the length of the run matters more than the source of the impedance values. A short run or a run of parallel conductors in steel conduit modeled as if in aluminum conduit carries the fault current of the switchboard down to equipment rated for less, which is why the raceway material and the length are inputs the report has to show. (6.4.6)

6.5 Rotating Machine Contribution

6.5.1 Every induction motor rated at or above the horsepower indicated in the datasheet, every synchronous motor, and every generator shall be modeled individually, at the subtransient reactance and the X/R the manufacturer publishes for the machine furnished, and at the typical values of IEEE 551 for its type and size where none is published.
Individually Modeled Motor Thresholdrange
hp
255075100150200250
NOTE Fifty horsepower is the line IEEE 551 draws between motors modeled one by one and motors grouped at their bus, and the line most studies follow without discussion; a threshold of zero models every motor individually, which a small system or a project with a complete motor list supports and which changes no result at the buses that decide a rating; a threshold above 50 horsepower is the arrangement of a large plant with hundreds of motors, where the individual data below the threshold is effort without effect at the medium-voltage buses and the motors are grouped at each motor control center instead. (6.5.2)
6.5.3 Induction motors below the threshold shall be treated as indicated in the datasheet.
Motors Below the Thresholdradio
● Lumped at each bus from the connected motor horsepower
○ Lumped at each bus as a share of the bus or transformer rating
○ Not modeled
NOTE Lumping the small motors at each bus from their connected horsepower gives the contribution the real load produces and needs a motor list by bus; lumping them as a share of the transformer or bus rating, commonly half of the transformer kVA at a 480 V bus with mixed load, needs no list and is the practice where the load is not yet known or on an existing system with no load inventory; leaving them out of the model understates the first-cycle duty at the buses the small motors sit on and is accepted where the motor load is a negligible part of the bus load, as on a lighting and receptacle distribution. (6.5.4)
6.5.5 Lumped motors shall be modeled in the first-cycle network with the IEEE 551 multipliers for motors below 50 horsepower and shall be omitted from the interrupting and time-delayed networks.
6.5.6 Every generator shall be modeled with the subtransient reactance, the transient reactance, the X/R, and the decrement curve of the alternator furnished, as the generator standard requires the manufacturer to state them, and the study shall be re-run under Study Revisions and Re-Study Triggers where an alternator of a different frame is furnished after the study is accepted.
6.5.7 A motor supplied through a drive, a soft starter in bypass, or a direct connection shall be modeled as contributing, and a motor supplied through a drive with a diode or thyristor front end and no bypass shall be modeled as not contributing, with the drive type recorded in the input data tables.
6.5.8 A motor supplied through a drive with an active or regenerative front end shall be modeled with the fault current contribution and duration the drive manufacturer publishes.
NOTE A motor stays a source for the first few cycles after a fault because its rotor keeps turning and its field does not collapse at once. Its contribution lands on the bus it is connected to and on every bus between it and the fault, and at a motor control center the motors can add a third again to the current the transformer supplies, which is why the motors are modeled at the bus they are connected to and not as a single lump at the service. (6.5.9)

6.6 Inverter-Based Sources

6.6.1 Every photovoltaic inverter, energy storage inverter, and uninterruptible power supply within the study boundary shall be modeled as a source with the fault current contribution and the duration the manufacturer publishes for the unit furnished, and at 1.5 times its rated output current for the first-cycle network where the manufacturer publishes none.
6.6.2 An uninterruptible power supply shall be modeled in inverter operation with the current limit of its inverter and in bypass operation with the upstream source passed through, and the higher result at each downstream bus shall govern.
6.6.3 The data for each inverter-based source shall be taken from the submittals under Photovoltaic SystemsPhotovoltaic SystemsResolves to the current adopted revision.sync/photovoltaic-systems, Battery Energy Storage SystemsBattery Energy Storage SystemsResolves to the current adopted revision.sync/battery-energy-storage-systems, or Uninterruptible Power Supply SystemsUninterruptible Power Supply SystemsResolves to the current adopted revision.sync/uninterruptible-power-supply-systems for the equipment furnished.
NOTE An inverter is a current-limited source and adds a bounded amount to the fault current at the bus it feeds, usually between one and two times its rated current for a few cycles. On a bus fed by a large utility transformer the addition is small; on the load side of a UPS or on a microgrid bus islanded from the utility it is the whole fault current, and the equipment there is rated against a value that the inverter's current limit, not the system impedance, decides. (6.6.4)

6.7 Source Operating Cases

6.7.1 The study shall calculate every operating case indicated in the datasheet at every calculation point that case supplies, and the highest result at each point across the cases shall govern the maximum case.
Source Operating Casescheckbox
☑ Utility source
☑ Each on-site generator or generator plant alone
☐ Utility and on-site generation paralleled
☐ Multiple services or transformers operated with ties closed
☐ UPS and energy storage sources in bypass and in inverter operation
NOTE Equipment on the load side of a transfer switch sees a different fault current from each source, and the rating has to cover the higher one; a generator plant alone usually gives less than the utility at the service and can give more at a bus near the paralleling switchgear; the utility and the generation paralleled, during a closed transition or in extended parallel operation, gives the sum of both at every bus between them and is the case that decides the paralleling bus rating; a double-ended substation or a pair of services with the tie closed doubles the source behind every bus on the common side and is a case whether or not the operating procedure forbids it, because the tie can be closed; a UPS in bypass passes the upstream source through to loads that in inverter operation see only the inverter's current limit. A case left out is a configuration the system can take up in which no rating has been checked. (6.7.2)
6.7.3 Where a paralleled case is selected, the contribution of every set shall be summed at the paralleling bus with the reactances and decrement curves of the alternators furnished, and the result shall be delivered to the paralleling switchgear standard for the bus rating it carries.
6.7.4 Where a transfer switch is within the study boundary, the study shall report the available fault current at its terminals from each source separately, together with the upstream overcurrent device on each source, for the withstand and closing rating the transfer switch standard carries.

6.8 Existing Equipment

6.8.1 Where the study boundary includes existing equipment, the data for that equipment shall be taken from the basis indicated in the datasheet.
Existing Equipment Data Basisselect
Field survey of every existing item within the study boundary
Field survey of items whose nameplate data is not in the Owner's records
Owner's record documents and prior studies without a field survey
Not applicable, no existing equipment within the study boundary
NOTE A survey of every existing item records what is installed rather than what was drawn, finds the breaker replaced with a lower-rated frame and the transformer retapped since the last study, and costs a survey visit for every item, under the facility's safety program; a survey limited to the items whose nameplate data the Owner's records lack keeps the visit short and trusts the records for the rest, which is the arrangement on a facility with a maintained equipment inventory or a recent prior study; the Owner's records and prior studies alone cost nothing on site and carry forward every change made without a drawing revision, which on an older facility is most of them. On new construction with no existing equipment the question does not arise. (6.8.2)
6.8.3 Where a field survey is selected, it shall record for each item surveyed the nameplate ratings, the frame size, trip unit, and interrupting rating of each protective device, any series rating label, the transformer impedance, and the conductor size and raceway material where visible, and shall be performed as energized work under the facility's electrical safety program (see Electrical Safety ProgramElectrical Safety ProgramResolves to the current adopted revision.sync/electrical-safety-program).
6.8.4 Every discrepancy between the surveyed condition and the Owner's record documents shall be reported to the Engineer of Record and the Owner within five working days of the survey and recorded in the assumption register.
6.8.5 An existing device with no legible interrupting rating shall be reported to the Engineer of Record, who shall direct the rating the study is to assume for it, and the device shall be identified in the report as a device of assumed rating.
NOTE An existing system is routinely modified, re-fed, and re-tapped over its life without a revision to the drawings, and the fault current at an existing panel is decided by what feeds it today. The record drawings are the starting point of the survey, not a substitute for it. (6.8.6)

6.9 Assumption Register

6.9.1 The study shall maintain an assumption register listing every input value that was not taken from a nameplate, a certified test report, the utility's written statement, or a measured length, with the value used, its source, the component it applies to, and the case it affects.
6.9.2 Every entry in the assumption register shall be re-examined at the as-built reconciliation or update, and every entry replaced by a measured or nameplate value shall be closed with the value that replaced it.
6.9.3 Where the result at a calculation point is within 10 percent of the rating of the equipment at that point and an assumption in the register affects that result, the report shall state the sensitivity of the result to that assumption.
NOTE A short-circuit result is only as good as its weakest input, and the weakest inputs are the ones that were assumed. The register is what lets the Engineer of Record see which results rest on a typical value and which on a nameplate, and it is the list the as-built pass works down. (6.9.4)

7 Equipment Duty Evaluation

7.1 Evaluations Performed

7.1.1 The study shall compare the calculated duty at every calculation point with each rating indicated in the datasheet for the equipment at that point, and shall report the rating, the duty, the margin, and the result for each.
Equipment Duty Evaluationscheckbox
☑ Interrupting rating of every overcurrent protective device
☑ Close-and-latch rating of every medium-voltage circuit breaker
☑ Short-time withstand rating of every switchgear assembly and unfused device
☑ Bus bracing of every switchgear, switchboard, motor control center, panelboard, and busway
☑ Marked short-circuit current rating of every transfer switch, controller, drive, control panel, and surge protective device
☑ Conductor short-circuit withstand for the clearing time of the upstream device
☑ Series-rated combinations against their listing and the motor contribution limit
NOTE Every rating in the list is one that NFPA 70 110.9 or 110.10 requires to be at least the available fault current, and each is tested on a different basis: an interrupting rating is a symmetrical current at a tested X/R, a close-and-latch rating is a peak or an asymmetrical current in the first cycle, a short-time withstand rating is a symmetrical current held for a stated time, a bus bracing rating is the first-cycle current the structure holds, a marked short-circuit current rating on a transfer switch, a controller, a drive, a control panel, or a surge protective device is a current the assembly was tested at with a specific class or size of overcurrent device ahead of it, and a conductor withstand is an energy that depends on the clearing time of the device ahead of the conductor. A project leaves an evaluation out where the equipment that carries that rating is not within the study boundary. (7.1.2)
7.1.3 Every interrupting rating shall be evaluated at the voltage the device is applied at, against the symmetrical current of the network its rating standard assigns, multiplied under Duty Networks where the calculated X/R exceeds the tested X/R.
7.1.4 Every close-and-latch rating and every bus bracing rating shall be evaluated against the first-cycle current, as the peak or the asymmetrical RMS value the rating is stated in.
7.1.5 Every short-time withstand rating shall be evaluated against the first-cycle symmetrical current for the rated duration of the assembly under IEEE C37.20.1 or IEEE C37.20.2, and the report shall state the rated duration beside the clearing time of the upstream device reported by the coordination study.
7.1.6 Every marked short-circuit current rating shall be evaluated together with the overcurrent device ahead of the equipment, and a rating that is conditional on a specific class, type, or maximum size of upstream device shall be reported as met only where the upstream device furnished is of that class, type, and size.
7.1.7 Every marked short-circuit current rating of a control panel shall be the rating marked under NFPA 70 409.110 and determined under Industrial Control PanelsIndustrial Control PanelsResolves to the current adopted revision.sync/industrial-control-panels, and the study shall furnish the available fault current at the panel for the record NFPA 70 409.22 requires.
7.1.8 Every conductor within the study boundary shall be evaluated for short-circuit withstand by the method of ICEA P-32-382 at the clearing time of the upstream device at the calculated current, taken from the coordination study where it is available and from the maximum clearing time of the device where it is not, and the result shall be re-evaluated when the coordination study is accepted.
7.1.9 Every rating evaluated shall be the rating of the equipment furnished or installed, taken from the submittal or the nameplate, and a catalog rating of a device the equipment is listed to accept shall not be used in place of the rating of the device furnished.

7.2 Series-Rated Combinations

7.2.1 Where an equipment standard selects a series rating basis for an assembly within the study boundary, the study shall identify each series-rated combination, the upstream device each depends on, the combination rating, and the listing under UL 489, UL 891, or UL 67 that covers it.
7.2.2 The study shall verify that the available fault current at the line terminals of the upstream device of each combination does not exceed the combination rating, and that the upstream device is fully rated for the current at its own terminals.
7.2.3 The study shall verify for each combination that the sum of the full-load currents of the motors connected between the upstream device and the downstream device does not exceed 1 percent of the downstream device's interrupting rating, as NFPA 70 240.86(C) requires, and shall report any combination that exceeds it as a deficiency.
7.2.4 Where a series rating is applied to an existing installation under engineering supervision in accordance with NFPA 70 240.86(A), the selection shall be made and documented by the study engineer as the licensed Professional Engineer responsible for it, and the documentation shall be included in the report.
7.2.5 A series-rated combination proposed as the remediation of a deficiency shall be referred to the coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study before it is accepted, because the upstream device of a series combination opens with the downstream device on a high-magnitude fault.
NOTE A series rating is a rating of a pair, not of a device. It holds only while the upstream device named in the listing is in place and while the motor contribution between the two devices stays below the limit, which is why the study records the pair and the listing rather than the downstream device's own rating, and why a replacement of either device is a re-study trigger. (7.2.6)

7.3 Deficiencies

7.3.1 Every device, assembly, or conductor whose rating is less than the calculated duty at its location shall be listed in the report as a deficiency, with its designation, its location, the case and network that produced the duty, the calculated duty, the rating, and the remediation options available for it.
7.3.2 The study shall consider the following remediation options for each deficiency, as each applies:
  • a device or assembly of a higher rating in the same position
  • a listed series-rated combination with the upstream device, where the equipment standard's rating basis admits one
  • a current-limiting fuse or current-limiting circuit breaker ahead of the deficient item, with the let-through current the manufacturer publishes at the calculated duty
  • added impedance ahead of the deficient item, as a current-limiting reactor or a transformer of higher impedance
  • an operating restriction that removes the case producing the duty, where the case is a tie closed or sources paralleled and the Owner accepts the restriction in writing
7.3.3 Where the study is delivered before equipment release, no item listed as a deficiency shall be released for manufacture until the Engineer of Record has directed its remediation in writing.
7.3.4 Where a deficiency is found in equipment already installed under the project, the item shall not be energized, and where it is energized, shall be removed from service, until it is remediated or the Engineer of Record directs otherwise in writing.
7.3.5 Where a deficiency is found in existing equipment that is to remain, the study engineer shall report it to the Owner and the Engineer of Record within five working days of the finding, and the Owner shall direct its remediation.
7.3.6 A deficiency in equipment furnished under the project against a rating the contract documents state shall be remediated by the Contractor at no change in the contract sum, and a deficiency that arises from a utility value, an existing condition, or a design basis that differs from what the contract documents state shall be remediated as the Engineer of Record directs under the change provisions of the contract.
NOTE A device applied above its interrupting rating does not fail to open; it fails to stop opening, with the arc sustained across contacts that cannot clear it. That is the failure NFPA 70 110.9 exists to prevent, and it is the reason a deficiency is a hold on energization rather than a finding for the record. (7.3.7)

8 Study Report

8.1 Report Content

8.1.1 The study report shall contain the following, in a single sealed document with numbered pages:
  • a cover page with the project, the system studied, the study engineer, the date of issue, the revision history, and the seal and signature required under Study Engineer
  • an executive summary stating the study boundary, the method, the cases, the highest available fault current in the system and where it occurs, and every deficiency found
  • a system description and the one-line diagram described under One-Line Diagram
  • the method statement, giving the calculation method, the duty networks, the fault types, the cases, the pre-fault voltage, the software and its version and library revision, and the hand verification required under Calculation Tool
  • the input data tables for the utility source, every transformer, every conductor and busway run, every motor and motor group, every generator, every inverter-based source, and every protective device, each with its source
  • the utility's written request and response
  • the assumption register
  • the results tables, giving at every calculation point, for every case, every network, and every fault type calculated, the symmetrical RMS current, the X/R, and the asymmetrical or peak value the rating at that point is evaluated in
  • the equipment duty evaluation tables required under Evaluations Performed, with the series-rated combinations identified
  • the deficiency list and the remediation options for each
  • the available fault current and date for each item of service equipment, as described under Available Fault Current Record
  • the re-study trigger list
  • appendices holding the manufacturer data sheets, test reports, and published tables the model is built from
8.1.2 The results tables shall be organized by calculation point in the order of the one-line diagram, so that the reader can follow the fault current from the service to any point in the system without searching the report.

8.2 One-Line Diagram

8.2.1 The report shall include a one-line diagram of the modeled system showing every source, bus, transformer, conductor and busway run, protective device, and calculation point, with the designation of each as the contract documents give it, the kVA and impedance of every transformer, the size, count, material, length, and raceway material of every conductor run, and the maximum three-phase and line-to-ground fault current and X/R at every calculation point.
8.2.2 The one-line diagram shall be reconciled with the contract one-line diagram, and every difference between the two shall be listed in the report and resolved with the Engineer of Record before the study is accepted.
8.2.3 Where the system is too large for one sheet, the diagram shall be divided across sheets with cross-references at every cut, and no bus shall appear on two sheets with two different values.
8.2.4 The one-line diagram shall be delivered in the format indicated under Report Format alongside the report, with the same identifiers as the results tables and the native model.

8.3 Available Fault Current Record

8.3.1 The report shall state, for each item of service equipment within the study boundary other than the service equipment of a dwelling unit, the maximum available fault current at its line terminals and the date of the calculation, as the data for the field marking NFPA 70 110.24(A) requires.
8.3.2 The value stated for the field marking shall be the maximum-case three-phase symmetrical current calculated under this standard at the line terminals of the service equipment, with the utility's value and the growth margin shown separately in the record.
8.3.3 The field marking itself, its material, its format, and its placement on the service equipment, shall be as the project's identification standard requires (see Equipment LabelingElectrical Equipment LabelsResolves to the current adopted revision.sync/equipment-labeling), and the Contractor shall apply the value and the date this study states and no other.
8.3.4 The calculation behind the marking shall be kept available to those who design, install, inspect, maintain, or operate the system, as NFPA 70 110.24(A) requires, and the closeout submittal of the record and the native model is how this standard meets that requirement.
8.3.5 Where a modification to the system changes the maximum available fault current at an item of service equipment, the marking shall be updated under NFPA 70 110.24(B), and the modification is a re-study trigger under this standard.
NOTE The marking at the service is the one place the available fault current is readable by the inspector, the installer of the next piece of equipment, and the electrician replacing a breaker, and a value marked from a utility letter rather than from the study omits the growth margin and the date the study was built on. The study is the source of the number; the identification standard is the source of the label. (8.3.6)

8.4 Report Format

8.4.1 The report shall be delivered in the formats indicated in the datasheet.
Report Formatcheckbox
☑ Sealed report in searchable PDF
☑ Native model files of the analysis software
☐ Editable one-line diagram in CAD format
☐ Bound printed copies
NOTE The sealed PDF is the record, the native model file is what every later study opens, the editable one-line is what the Owner's drafting staff fold into the record drawings, and the printed copy is what sits in the electrical room for the inspector; a project adds the last two where its record-drawing and closeout practice call for them. (8.4.2)
8.4.3 Where the native model files are selected, they shall be delivered under the condition stated under Closeout Submittals, and the report shall name the software version that opens them.

8.5 Handoff to the Coordination and Arc-Flash Studies

8.5.1 The accepted model, with its input data, assumption register, and results, shall be furnished to the engineer performing the coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study and to the engineer performing the arc-flash study under Arc Flash StudyArc-Flash StudyResolves to the current adopted revision.sync/arc-flash-study, and both studies shall be built on that model or on a model verified against its one-line, input data, and results.
8.5.2 The results delivered to the coordination study shall include, at every calculation point, the maximum and minimum three-phase and line-to-ground fault currents and the X/R of each, in every operating case calculated.
8.5.3 The results delivered to the arc-flash study shall include, at every calculation point, the maximum and minimum three-phase bolted fault current in every operating case calculated, together with the source configuration that produced each.
8.5.4 Where the study is revised after the coordination study or the arc-flash study has been performed on it, the study engineer shall issue the revision to the engineers performing those studies on the day it is issued, and the Contractor shall not energize equipment whose settings or labels rest on the superseded results until both studies have been re-run.
NOTE Three studies on three models are three answers to one question, and the one that reaches the label on the door is whichever ran last. One model, handed forward with its assumptions, is how the fault current the arc-flash label is calculated from stays the fault current the breaker was ordered to. (8.5.5)

9 Study Revisions and Re-Study Triggers

9.1 Study Revisions Within the Project

9.1.1 The study engineer shall correct every calculation error and reporting error in the study that is identified before the end of the project's correction period, and shall re-issue the affected pages and the native model, at no cost to the Owner.
9.1.2 The study shall be revised whenever, after it is accepted and before the equipment within the study boundary is energized, the equipment furnished departs from the equipment modeled in a transformer impedance, a generator alternator, a protective device frame or type, a series-rated combination, or a conductor size, count, or raceway material, and the revision shall re-run every case the change affects.
9.1.3 A revision caused by a substitution or a change in the equipment furnished by the Contractor shall be made at the Contractor's cost, and a revision caused by a change in the utility's value, an existing condition, or the design shall be made as the Engineer of Record directs under the change provisions of the contract.
9.1.4 Every revision shall carry a revision number and date on the cover, a list of the results that changed, and a statement of whether the coordination study and the arc-flash study need to be re-run on it.

9.2 Re-Study Triggers

9.2.1 The report shall include a re-study trigger list, written for the Owner's operations staff, naming the events after which the Owner is to commission an updated short-circuit study before the affected portion of the system is returned to normal operation.
9.2.2 The re-study trigger list shall name at least the following events:
  • notice from the utility of a change in the available fault current or the X/R at the point of delivery, or a change in the utility's service transformer
  • the addition, removal, or re-rating of a generator, an inverter-based source, or a UPS, or a change in the alternator of a generator
  • the replacement or re-tapping of a transformer, or a change in its impedance
  • a change in the size, count, length, or raceway material of a service or feeder conductor
  • the addition of a motor at or above the threshold indicated under Rotating Machine Contribution, or of a motor group that changes the lumped load at a bus
  • the replacement of a protective device with one of a different make, frame, or type, where the device is part of a series-rated combination or protects a conductor whose withstand was evaluated at its clearing time
  • a change in the system configuration that creates a new operating case, such as a new tie, a closed-transition transfer, or a parallel connection to the utility
  • a facility expansion or a modification that changes the maximum available fault current at an item of service equipment, which NFPA 70 110.24(B) requires to be re-marked
  • the five-year review of the arc-flash risk assessment under NFPA 70E 130.5(G), which rests on this study's results
9.2.3 Where any trigger event occurs, the updated short-circuit study shall be followed by an updated coordination study under Protective Coordination StudyProtective Device Coordination StudyResolves to the current adopted revision.sync/protective-coordination-study and an updated arc-flash study under Arc Flash StudyArc-Flash StudyResolves to the current adopted revision.sync/arc-flash-study for the affected portion of the system.
9.2.4 The re-study trigger list shall be included in the operation and maintenance documentation of the electrical system, and the Owner's change procedures for the electrical system shall name the responsible engineer to be notified when a trigger event occurs.
NOTE The fault current at a bus is a property of everything upstream of it, and most of the events that change it are ordinary maintenance: a transformer swapped for the one in stock, a breaker replaced with another make, a feeder re-pulled on a different route. None of them look like a reason to commission a study, which is why the list is written for the operations staff in the words of the work they do rather than in the terms of the calculation. (9.2.5)

Written and maintained by SynC. Licensed under CC BY 4.0.