title: Arc-Flash Hazard Analysis
…31 unchanged lines
## Work practices and training shall be coordinated with [[sync/electrical-safety-program]].
−## Equipment scope shall be coordinated with [[sync/low-voltage-switchgear]], [[sync/medium-voltage-switchgear]], [[sync/low-voltage-switchboards]], [[sync/low-voltage-panelboards]], [[sync/motor-control-centers]], and [[sync/dry-type-transformers]].
+## Equipment scope shall be coordinated with [[sync/low-voltage-switchgear]], [[sync/medium-voltage-switchgear]], [[sync/low-voltage-switchboards]], [[sync/low-voltage-panelboards]], [[sync/motor-control-centers]], and [[sync/transformers]].
## The arc-flash study shall include every piece of equipment specified by the coordinated equipment standards that is within the analysis voltage threshold.
…710 unchanged lines
## Labels that detach, fade, or are found to disagree with the report during the warranty period shall be replaced at no cost to the Owner.